Laserfiche WebLink
6. Subsidence: Add materia f like kind to bring to finish grade any a showing subsidence during <br />guarantee period, by adding compacted backfill or additional pavement. <br />a. Submit a written report to Contractor and Division of the State Architect field inspector and to <br />Project Engineer. Final decision shall be made by the Project Engineer. <br />7. Submission of Certification Documentation: <br />a. Submit all certificates and Reports of Test Procedures and results to the Division of the State <br />Architect inspector within 15 days of completion of test. <br />3.13 ALUMINUM FILL TUBE <br />A. Field measured and cut to correct length with 45 degree angle. <br />3.14 TANK FUEL LEVEL SENSOR AND LEAK DETECTION SYSTEM <br />A. Installation: In accordance with manufacturer's written recommendations. <br />B. Panel Location: Locate fuel level sensor and leak detection panels in gas/oil house. Coordinate exact <br />location with Construction Supervisor. <br />3.15 SENSOR CABLE <br />A. Installation: Install tank fuel level sensor cables and leak monitoring cables in 1 inch conduit. <br />3.16 CONCRETE WORK <br />A. General: Refer to Section 03001 - Concrete. <br />END OF SECTION <br />UNDERGROUND FUEL STORAGE T.kNK <br />070601:HTL:lc:cw 13215-27 CH 107517 / 107518 <br />