My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2001-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:23 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2004
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2001-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Subsidence: Add materia f like kind to bring to finish grade any a showing subsidence during <br />guarantee period, by adding compacted backfill or additional pavement. <br />a. Submit a written report to Contractor and Division of the State Architect field inspector and to <br />Project Engineer. Final decision shall be made by the Project Engineer. <br />7. Submission of Certification Documentation: <br />a. Submit all certificates and Reports of Test Procedures and results to the Division of the State <br />Architect inspector within 15 days of completion of test. <br />3.13 ALUMINUM FILL TUBE <br />A. Field measured and cut to correct length with 45 degree angle. <br />3.14 TANK FUEL LEVEL SENSOR AND LEAK DETECTION SYSTEM <br />A. Installation: In accordance with manufacturer's written recommendations. <br />B. Panel Location: Locate fuel level sensor and leak detection panels in gas/oil house. Coordinate exact <br />location with Construction Supervisor. <br />3.15 SENSOR CABLE <br />A. Installation: Install tank fuel level sensor cables and leak monitoring cables in 1 inch conduit. <br />3.16 CONCRETE WORK <br />A. General: Refer to Section 03001 - Concrete. <br />END OF SECTION <br />UNDERGROUND FUEL STORAGE T.kNK <br />070601:HTL:lc:cw 13215-27 CH 107517 / 107518 <br />
The URL can be used to link to this page
Your browser does not support the video tag.