My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7S WRCB, January 2002 <br />7. MER -DISPENSER CONTAINMENT (UDCi TEAG <br />Page 5 of 7 <br />Test Method Developed By: <br />❑ UDC Manufacturer <br />❑ Other (Specify) <br />❑ Industry Standard ® Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Specify) <br />❑ vacuum <br />® Hydrostatic <br />Test Equipment Used: INCON STS <br />Equipment Resolution: .002 <br />UDC Manufacturer: <br />UDC #1 UDC # <br />UDC # UDC # <br />Unknown <br />UDC Material: <br />Plastic <br />UDC Depth: <br />30" <br />Height from UDC Bottom to Top of <br />Highest Piping Penetration: <br />11" <br />Height from UDC Bottom to Lowest <br />Electrical Penetration: <br />9" <br />Condition of UDC prior to testing: <br />Good <br />Portion of UDC Tested' <br />2" Above Piping <br />Penetration <br />Does turbine shut down when UDC <br />sensor detects liquid (both product and <br />water)?* <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />NA <br />Is system programmed for fail-safe <br />shutdown?' <br />❑ Yes F]No ®NA <br />El Yes ElNo ❑ NA <br />E] Yes E]No ElNA El Yes ❑ No [:1NA <br />Was fail-safe verified to be operational?` <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and startin test <br />15 Minutes <br />Test Start Time: <br />11:57/12:12 <br />Initial Reading Ri): <br />3.1198/3.1209 <br />Test End Time: <br />12:12/12:27 <br />Final Reading (RF): <br />3.1208/3.1206 <br />Test Duration: <br />2-15 Minute Tests <br />Change in ReadingRF-Ri): <br />.001/.0003 <br />Pass/Fail Threshold or Criteria: <br />.002/.002 <br />Test Result: <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑ No ❑ NA <br />Yes No <br />❑ ❑ ❑ NA <br />❑ Yes ❑ No NA Yes <br />❑ ❑ ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to qny of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must he tested. (See S"CB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.