My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
2300 - Underground Storage Tank Program
>
PR0231989
>
COMPLIANCE INFO_2008-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 8:46:42 AM
Creation date
6/23/2020 6:54:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2016
RECORD_ID
PR0231989
PE
2361
FACILITY_ID
FA0003976
FACILITY_NAME
VALLEY PACIFIC CHARTER WAY CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
01
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231989_1501 W CHARTER_2008-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/18/2015 02:13PM 6616349233 KERN CONSTRUCTION PAGE 17/27 <br /> SWRCB,January 2002 Page q of <br /> UNDER-DISPENSER CONTAINMENT"Q TESTING <br /> Test Method Developed By: ❑UDC Manufacturer x Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum x Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Incon is-sts Equipment Resolution:.001" <br /> UDC#1-2 UDC#3-4 UDC#5-6 Sat UDC#6-7 <br /> UDC Manufacturer: Bravo Bravo Bravo <br /> UDC Material: Steel Steel Steel <br /> UDC Depth: 12" 12" 1T, <br /> Height from UDC Bottom to Top 0" 0" 0" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 0" 0" 0" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Clean Clean Clean <br /> testing: _ <br /> Portion of UDC Tested' 1/2 1/2 1 1/2 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No ❑NA ❑Yes ❑No X NA 0 Yes ❑No X NA ❑Yes ❑No X NA <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail- 0 Yes ❑No ❑NA ❑Yes ❑No X ❑yes ❑No X NA ❑Yes ❑No X NA <br /> safe shutdown?' NA <br /> Was fail-safe verified to be ❑yes ❑No ❑NA ❑Yes ❑No X 11 Yes ❑No X NA ❑Yes 0 No X NA <br /> operational?' NA <br /> Wait time between applying 15 min. 15 min. <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 7:36 7:36 9:15 <br /> Initial Reading(Ri): 3.708 0.480 0.483 <br /> Test End Time: NOT TESTED 7:51 7:51 9:30 <br /> Final Reading(RF): 3.707 0.479 0.483 <br /> Test Duration: 15 Min. 15 Min 15 Min <br /> Change in Reading(Rx-RI): 1 0.001 0.001 0.000 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 <br /> Test:Resnit: ❑ Pass .❑Fail- X Pass ❑Fail X Pass 0 Fail <br /> Was sensor removed for testing? ❑Yes ❑No DNA ❑Yes ❑No X NA 0 Yes ❑No X NA ❑Yes 0 No X NA <br /> Was sensor properly replaced and ❑yes ❑No 0 NA ❑Yes ❑No X NA 0 Yes ❑No X NA ❑Yes ❑No X NA <br /> verified functional after testing? <br /> COmmelltS— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UDC 1-2 Not tested due to leakin2 entry fittin . PM <br /> .MRIL. <br /> MAR 18 2015 <br /> ENVIRONMEML <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to a,of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Received Time Mar. 18, 2015 3: 16PM No. 8366 <br />
The URL can be used to link to this page
Your browser does not support the video tag.