My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 8:28:42 AM
Creation date
6/23/2020 6:54:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2016-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> SECONDARY LINE TESTING OCT 5 2017 <br /> F A 11 711-1 <br /> EP RT*MEt,FF <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: • Pressure o vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> Description Line#1 Line#2 Line#3 <br /> Tank product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Pipe manufacturer Smith Smith Smith <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 <br /> Method of secondary pipe isolation Clam Shell Clam Shell Clam Shell <br /> Location of secondary pipe isolation STP STP STP <br /> Estimated length of piping run (feet) 50 50 50 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) :10 :10 :10 <br /> Test start time 10:05 AM 10:06 AM 10:07 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 <br /> Test end time 11:05 AM 11:06 AM 11:07 AM <br /> Final pressure(psig) 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> 02017 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.