My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 8:28:42 AM
Creation date
6/23/2020 6:54:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2016-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R.E(-_.%vENED <br /> PRODUCT PIPING SUMP TESTING OCT 2 5 2017 <br /> F,)EPARTMENT <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: o Pressure o vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Tank#1 Tank#2 Tank#3 <br /> Tank product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Sump material FRP FRP FRP <br /> Sump diameter (inches) 42 42 42 <br /> Sump depth (inches) 42 43 44 <br /> Height from tank top to highest 6 7 7 <br /> piping penetration (inches) <br /> Height from tank top to lowest 10 9 10 <br /> electrical penetration (inches) <br /> Method of sump attachment to tank Manway Manway Manway <br /> Condition of sump prior to testing Dry Dry Dry <br /> Portion of sump tested Entire Entire Entire <br /> Is system programmed for fail-safe operation? Unknown Unknown Unknown <br /> Was fail-safe verified to be operational? No No No <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor properly replaced after testing? Yes Yes Yes <br /> Depth of water level from tank top (inches) 12 11 12 <br /> Wait time for water level to stabilize (hr:min) :15 :15 :15 <br /> Test start time 10:31 AM 10:31 AM 10:49 AM <br /> Initial Probe Reading 0.6542 1.6103 0.6638 <br /> Test end time 10:46 AM 10:46 AM 11:04 AM <br /> Final Probe Reading 0.6538 1.6105 0.6636 <br /> Test duration (hr:min) 0:15 0:15 0:15 <br /> Change in water level (±0.0000 inches) -0.0004 0.0002 -0.0002 <br /> Pass/Fail threshold (±0.002 inches/:Hr.) 0.0020 0.0020 0.0020 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> 0 2017 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.