Laserfiche WebLink
SV,rRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(fern) <br /> Test Method Used: X Pressure 0 Vacuum [-1 Hydrostatic <br /> D Other(Spec((y) <br /> [Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run 0 1 Piping Run#2 Piping Run N 3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 311 3" 3" 3" <br /> Length of Piping Run: Approx.30' Approx.30' Approx.30' Approx.30' <br /> Product Stored: Diesel-East Diesel-West Gas-East Gas-West <br /> Method and location of Test boot at Piping Test boot at Piping Test boot at Piping Test boot at Piping <br /> piping-run isolation: Sump#1 Sump#1 Sump#2 Sump#2 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test; <br /> Test Start Time: 9:25 9:30 9:35 9:40 <br /> Initial Reading(R,): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 10:25 10:30 10:35 10:40 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: I Hour I Hour I Hour I Hour <br /> Change-in Reading(RF R,): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or <br /> No detectable loss No detectable loss No detectable loss No detectable loss <br /> I Criteria: <br /> Vass Pass Pass <br /> . Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-upfor failed tests) <br /> Note: Ali four old Blue Line Test boots had material degradation and would not provide proper seal for testing of <br /> Secondary Pipe. *See comments below. <br /> *Replaced Secondary Pipe test boot for Piping Run#1/Diesel-East at Piping Stimp#1,prior to testing. <br /> *Replaced Secondary Pipe test boot for Piping Run#2/Diesel-West at Piping Sump#1,prior to testing. <br /> *Replaced Secondary Pipe test boot for Piping Run#3/Gas-East at Piping Sump#2,prior to testing. <br /> *Replaced Secondary Pipe test boot for Piping Run#4/Gas-West at Piping Sump#2,prior to testing. <br />