Laserfiche WebLink
JUN -04-2008 14:44 Service Station Systems 408 938 8888 P.O? <br />Test Method Developed By: <br />❑ Stunp Manufacturer <br />❑ Other (Specify) <br />® Industry Standard ❑ Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used: Incon Sump Tester <br />STP Sump # 87 A <br />"Sumpiameter: 42" <br />STP Sump # 87 B <br />42" <br />Equipment Resolution: +/- 0.002" <br />STIP Sump # 89 A STP Sump # 89 B <br />42" 42" <br />Sump I?epth: <br />SO" <br />KO" <br />80" <br />80" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />14" <br />14" <br />14" <br />14" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />22" <br />22„ <br />2291 <br />22" <br />Condition of sump prior to testing: <br />Good <br />Good <br />Good <br />Good <br />Portion of Sump Tested' <br />2" above piping <br />2" above piping <br />2" above piping <br />2" above piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water ?41 <br />ElYes [INo ® NA <br />ElYes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />❑ Yes 1:1No RNA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail -Safe <br />shutdown?" <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No RNA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />Was fail-safe verified to be <br />operational?® <br />® Yes ❑ No ® NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />Wait time between applying <br />pressure✓vacuum/water and starting <br />test: <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />12:15 pm <br />11:06 am <br />12:15 pm <br />12:15 pm <br />.Initial Reading (R,): <br />5.6934 <br />4.8910 <br />3.5379 <br />4.1362 <br />Test End Time: <br />12:31 pm <br />11:21 am <br />12:30 pm <br />12:30 pm <br />Final Reading (Rv): <br />5.5978 <br />4.8907 <br />3.5390 <br />4.1342 <br />Test Duration: <br />16 min. <br />15 ruin. <br />15 min. <br />15 min. <br />Change in Reading (RF�Ri): <br />-0.0956 <br />-0.0003 <br />+0.001' <br />-0.020 <br />Pass/Fail Threshold or Criteria: <br />4-0.0021, <br />+/-0.00211 <br />+/.0.00211 <br />+/- 0.002" <br />Test Result: <br />lass ® Fail <br />® Pass Fail <br />® Pass Fail <br />Pass [R] ail <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ® NA <br />® Yes ❑ No []NA <br />® Yes ❑ No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes E) No ❑ NA <br />Yes ❑ No p NA <br />®Yes ❑ No []NA <br />®Yes ❑ No ❑NA <br />COMMentS — (include information on repairs made prior to testiM, and recommendedfollow-ffE&Lfailed tests) <br />'Sensor functionality was not confirmed. This procedure is <br />not part of the Secondary Containment testing scope of work". <br />87 A and 89 B failed. Possible piping penetrations <br />' If the entire depth of the sump is not tested, specify how much was tested. if the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />