Laserfiche WebLink
JUN -04-2008 14:44 Service Station Systems 408 938 8888 P.08 <br />:; "t h 1 t• <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />❑ Other (Specify) <br />® Industry Standard ❑ Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used: Incon Sump Tater <br />STP Sump # 91 A <br />Sump Diameter: 42" <br />STP Sump # 91 B <br />42" <br />Equipment Resolution: +/- 0.002" <br />STP Sump # DSL <br />42" <br />Sump Depth: <br />80" <br />80" <br />80" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Pi in Penetration: <br />14" <br />14" <br />1499 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />22„ <br />22" <br />22" <br />Condition of sump prior to testing: <br />Good <br />Good <br />Good <br />Portion of Sump Tested' <br />2" above piping <br />2" above piping <br />2" above piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />roduct and water)?` <br />❑ Yes L]No ® NA <br />❑ Yes L]No ®NA <br />❑ Yes E]No ®NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?' <br />❑ Yes p No ® NA <br />❑ Yes ❑ No ®NA <br />0 Yes ❑ No ®NA <br />Was fail-safe verified to be <br />o2jrationalf <br />❑ Yes ❑ No ® NA <br />® Yes ❑ No ®NA <br />❑ Yes ® No ®NA <br />Wait time between applying <br />pressurelvacuum/water and starting <br />test: <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />1:46 pm <br />11:06 am <br />1:46 pm <br />initial Reading (RI): <br />2.7633 <br />4.0811 <br />4.7199 <br />Test End Time: <br />2:01 pm <br />11:21 am <br />2:02 pm <br />Final Reading (Rp): <br />2.7612 <br />4.0799 <br />4.7072 <br />Test Duration: <br />15 min. <br />15 min. <br />16 min. <br />Change in Reading (Rv-R,): <br />41.0021 <br />-0.0012 <br />AA127 <br />Pass/Fail Threshold or Criteria: <br />4-0.00211 <br />t/• 0.002" <br />+/• 0.002" <br />Test Result: <br />Pass ® Fail <br />® Pass Fail <br />Pass Ill Fall <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No [INA <br />Was sensor properly replaced and <br />verified functional after testing? <br />® Yes ❑ No ❑ NA <br />0 Yes ® No ❑ NA <br />® Yes ❑ No ❑NA <br />COti1MentS — (include infonnadon on repairs made prior to testing, and recommended follow-up for failed tests) _ <br />"Sensor functionality was not confirmed. This procedure is <br />not part of the Secondary Containment testing scope of work". <br />91 A and DSL failed. Possible piping penetrations <br />E if the entire depth of the sump is not tested, specify how much was tested. If the answer to xX of the questions indicated with an <br />asterisk M is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />