My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:40:04 PM
Creation date
6/23/2020 6:56:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2007
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 9 0 Page 7 of <br /> 14. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: El Pressure 11 Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Fest Equipment Used: MTS Mag Probe W/TDU Meter Equipment Resolution: .001" <br /> ,#6-91 Sump#5-89 Sump#4-87 Sump#3-Diesel <br /> Sump Diameter: 42" 42" 42" 427' <br /> Sump Depth: 79" 82" 83" 79" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16" 17 16" 36" <br /> Highest Pipinr,,y Penetration: <br /> Height from Tank Top to Lowest 50" 50" 50" 50" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good Good Good <br /> Portion of Sump Tested' 2011 20" 20" 40" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 0 Yes XNo DNA 0 Yes XNo 0 NA 11 Yes X No 0 NA 11 Yes XNo DNA <br /> product and water)?. - <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe 0 Yes DNo XNA 0 Yes 0 No X NA 0 Yes 0 N X NA 0 Yes 0 N XNA <br /> shutdown?* <br /> Was fail-safe verified to be El Yes 0 N XNA DYes 0 N X DYes 11 No X NA 0 Yes 0 No X NA <br /> operationalf <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 Min 10 in 10 in 10 Min <br /> test: <br /> Test Start Time: 10:22 11:15 12:30 9:22 <br /> Initial Reading(Rj): 0.0001, 0.0001, 0.0001, 0.0001, <br /> Test End Time: 10:34 11:27 12:42 9:34 <br /> Final Reading(RF): -0,071 0.382" 0.000,t 0.0001, <br /> Test Duration: 12 Min 12 Min 12 Min 12 Min <br /> Change in Reading(RF-Rj): -0.071" 0.382" 0.0001, 0.00019 <br /> Pass/Fail Threshold or Criteria: +/- .002" +/- .002" +/- .002" +/- .002" <br /> Test Result: 0 Pass X Fail 0 Pass -X-Fal-I X Pass 0 Fail- X Pass 0 Fail <br /> — - --] <br /> Was sensor removed for testing? KYes DNo DNA 5Z Yes 0 No 0 NA X Yes 0 No 0 NA X Yes [I No 0 NA <br /> Was sensor properly replaced and XYes 0 N 01 ]No DNA XYes 0 N Cl NA XYes 0 N DNA <br /> verified functional after testing? <br /> Comments—(i tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to my of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.