Laserfiche WebLink
0 0 <br /> SWRCB,January 2002 Page 1) of <br /> 15. PIPING SUM[PST <br /> Test Method Developed y: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: MTS Magnostrictive Probe /TDU Meter Equipment Resolution: .001" <br /> Sump#2-Diesel Sump#1 -Diesel Sump# Su <br /> "Sumpiameter: 42" 42" <br /> Sump Depth: 82" 83" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 36„ 36" <br /> Highest Pip!a&Penetration: <br /> Height from Tank Top to Lowest 50" 50" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good <br /> Portion of Sump Tested' 40" 40" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes X No ❑NA ❑Yes X No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?' <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail-safe ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No DNA ❑Yes ❑No 0 NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 Min 10 Min <br /> test: <br /> Test Start Time: 10:00 11:00 <br /> Initial Reading(R,): 0.000" 0.000" 0.000" 0.000" <br /> Test End Time: 10:12 11:12 <br /> Final Reading(RF): -0.051" 0.000" <br /> Test Duration: 12 Min 12 Min 12 Min 12 Min <br /> Change in Reading( F- 4): -0.051" 0.000" <br /> Pass/Fail Threshold or Criteria: +/- .002" +/-.002" +l- .002" +/- .002" <br /> TestResult: 0 Pass X Fail X Pass ❑Fail E3 Pass 0 Frill ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Y ❑No ❑NA ❑Yes D No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA Cl Yes ❑No ❑NA <br /> verified functional after testin <br /> e is®- (include information on repairs made prior to testis K, and recon mended follow- for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to Aaa of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See S RCB LG-160) <br />