Laserfiche WebLink
pumps are returned to service until inspected and repaired by a licensed contractor. <br /> Line and tank precision tests should be performed by a licensed contractor. <br /> The propane tanks are to be visually inspected for leakage and mooring. If the <br /> mooring is loose or cracks are evident, a contractor will be called to remove the <br /> materials from the tank. <br /> Any visual fuel spillage from any source is to be abated in accordance with section 4 <br /> above. <br /> 7. HAZARDOUS WASTE CONTINGENCY <br /> Specific procedures for prevention,mitigation and abatement of a release of <br /> hazardous waste generated at your business. This section only applies to hazardous <br /> waste generators. <br /> The "Ripon Flying J Travel Plaza"is a licensed "hazardous waste generator. " <br /> However, due to the quantities and types of materials stored on site, certain protocol <br /> is maintained. <br /> Hazardous waste streams include: Under dispenser and turbine sump contact water, <br /> used gasoline and diesel filters, and contaminated absorbents. <br /> All potentially hazardous materials, greater than five gallons, are stored in locked <br /> cabinets, or in tanks which are locked. The oil water separator has a heavy cover, <br /> making accessibility difficult. All hazardous materials are labeled as such and MSDS <br /> are located at each facility. Facility personnel have been trained in the handling of <br /> these materials (record of the training are located in the General Manager's Office) <br /> The disposal of hazardous materials, including those from the oil water separator, is <br /> to be done only by a contractor licensed to haul hazardous waste in the state of <br /> California. Hazardous materials which are not used over a 90 day period are to be <br /> disposed of by a licensed hazardous waste contractor. <br /> 8. UNAUTHORIZED RELEASE RESPONSE PLAN <br /> Specific procedures for mitigation, abatement and reporting of an unauthorized <br /> release from an underground storage tank(UST). The plan must address a release <br /> from a single wall or a double wall tank system as applicable. This plan should cover <br /> the entire UST system. This section only applies to UST owner/operators. <br /> This description concerns only an underground release. Please see previous sections <br /> for surface releases. <br /> 1. Upon recognition of a suspected unauthorized release from the primary <br /> containment to the interstitial space of either a double wall tank or a product line, <br /> or a suspected breach in the secondary containment,personnel shall notify the <br /> facility manager, or the most senior personnel currently on site. <br />