My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 3:56:53 PM
Creation date
6/23/2020 6:57:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 5 of 7 <br />7. <br />Test Method Developed By: <br />UNDER -DISPENSER CONTAINMENT UDC TESTING <br />❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used:Incon TS -STS <br />UDC Manufacturer: <br />UDC #22 Main <br />UDC #23Main <br />Equipment Resolution:+/ -0.0001" <br />UDC #24Main UDC #25 Main <br />UDC Material: <br />FRP <br />FRP <br />FRP <br />FRP <br />UDC De the <br />27" <br />27" <br />27" <br />27" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />71' <br />7" <br />7" <br />8" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />5" <br />6" <br />6" <br />5" <br />Condition of UDC prior to <br />testing: <br />Clean <br />Clean <br />Clean <br />Clean <br />Portion of UDC Tested <br />2"above highest Pipe pen <br />2"above highest Pipe pen <br />2"above highest Pipe pen <br />2"above highest Pipe pen <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />®Yes ❑No [:INA <br />❑Yes [-]No ❑NA <br />❑Yes ❑No ❑NA <br />❑Yes ❑No [—INA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?` <br />Yes No NA <br />® ❑ ❑ <br />Yes No ❑ NA <br />® ❑ <br />®Yes ❑ No ❑ <br />®[:]NoNA Yes No RNA <br />Was fail-safe verified to be <br />operational?* <br />Yes No ®NA <br />❑ ❑ <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />4:31 4:49 <br />5:46 6:02 <br />5:46 6:02 <br />Initial Reading (Ri): <br />3.8592 3.8587 <br />1.9052 1.9034 <br />1.4618 1.4580 <br />Test End Time: <br />4:46 5:04 <br />6:01 6:18 <br />6:01 6:18 <br />Final Reading (RF): <br />3.8586 3.8583 <br />1.9045 1.9015 <br />1.4607 1.4556 <br />Test Duration: <br />15 Min Each (30 Min) <br />15 Min Each (30 Min) <br />15 Min Each (30 Min) <br />15 Min Each (30 Min) <br />Change in Reading (RF -Rt): <br />1 <br />0.0006 0.0004 <br />0.0007 1 0.0019 <br />0.0011 1 0.0024 <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />Test Result: <br />❑ Pass ' ® Fail <br />M; Pass , ❑ Fail <br />M, Pass ❑ Fail <br />® Pass ❑ Fail <br />Was sensor removed for testing? <br />®Yes ❑No [INA <br />®Yes ❑No ❑NA <br />®Yes ❑No FNA <br />®Yes [—]No ❑NA <br />Was sensor properly replaced and ❑ [:INA ❑ <br />verified functional after testing? ®Yes ❑ No ❑ NA ®Yes ❑ No ❑ NA ®Yes No NA ®Yes No NA <br />Comments — (include information on repairs made prior to testing, and recommended follow -tip for failed tests) <br />Under dispenser # 22 Failed Hydrostatic test. <br />Under dispenser # 23, 24 and 25 main Passed Hydrostatic test. <br />t If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.