Laserfiche WebLink
SWRCB. January 2002 <br />Page _ of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />x Piping Manufacturer Industry Standard 0 Professional Engineer <br />E Other (Specrf, ) <br />Test Method Used: <br />x Pressure 0 Vacuum Hydrostatic <br />E Other (Specify) <br />1 Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: I/10-15 psi <br />=11111111M <br />Piping Run # 5 91 <br />Piping Run # 2 Piping Run # <br />Piping Run# <br />Piping Material: <br />FRP <br />Piping Manufacturer: <br />E.O. SMITH <br />Piping Diameter: <br />2"- 3" <br />Length of Piping Run: <br />Approx. 175' <br />Product Stored: <br />91 <br />IMM <br />Method and location of <br />piping -run isolation: <br />Test boot inside sump <br />Wait time between applying <br />press ure/vacuum/water and <br />starting test: <br />5 Minutes <br />NON 0 8 2017 <br />Test Start Time: <br />1:00 P.M. <br />PKj\/MnNMENTAL <br />HEA -TH <br />Initial Reading (Rj): <br />5 Psi <br />T)FIDARKMENT <br />Test End Time: <br />2:00 p.m. <br />Final Reading (RF): <br />5 Psi <br />Test Duration: <br />I Hour <br />Change in Reading (RF-Rj): <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No loss in Psi <br />Test Result: <br />x Pass 0 Fail <br />Pass 0 Fail Pass 0 Fail <br />Pass 0 Fail <br />Comments — (include iqfomafion on repairs made prior to testing, and recommended follow-up for.failed tests) <br />