My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 3:10:02 PM
Creation date
6/23/2020 6:57:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2013-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, Januar} 2002 <br />6. PIPING SUMP TESTING <br />Page of <br />Test Method Developed By: ❑ Sump Manufacturer _:. Industry Standard x Professional Engineer <br />❑ Other (Sped) <br />Test Method Used: 0 Pressure ❑ Vacuum x Hydrostatic <br />❑ Other (Specify -9 <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .0025 <br />"Sumpmeter: <br />Sump # TI 87 <br />Master <br />Sump # T2 87 <br />S hon <br />Sump # T3 91 <br />Sump # T4 <br />48" <br />48" <br />48" <br />Sump Depth: <br />74" <br />76" <br />72" <br />Sump Material: <br />FRP <br />FRP <br />FRP <br />NON <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />35" <br />35" <br />37" <br />Height from Tank Top to Lowest <br />Electrical Penetration:T <br />44" <br />40" <br />37" <br />TAS- HEAU <br />Condition of sump prior to testing: <br />DRY <br />DRY <br />DRY <br />— <br />Portion of Sump Tested' <br />Water Line 46" <br />Water Line 42" <br />Water Line 39" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?' <br />x Yes []No ❑ NA <br />x Yes ❑ No J NA <br />x Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />5 seconds <br />6 seconds <br />5 seconds <br />Is system programmed for fail-safe <br />shutdown? <br />x Yes ❑ No ❑ NA <br />x Yes 0 No 1—� NA <br />x Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />x Yes ❑ No ❑ NA <br />x Yes 11No ❑ NA <br />x Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />12:40 p.m. <br />1:30 p.m. <br />12:15 P.M. <br />Initial Reading (Ri): <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />1:10 P.M. <br />2:00 p.m. <br />2:45 p.m. <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />x Pass 0 Fail <br />x Pass ❑ Fail <br />x Pass ❑ Fail <br />Pass ❑ Fail <br />Was sensor removed for testing? <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />x Yes 11No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -I60) <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.