Laserfiche WebLink
' S'WRC13,January 2002 Page 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Tank Manufacturer Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used: X] Pressure F Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> 1= Piping Run# 1 DIE Piping Run# 1 DIE Piping Run# 1 DIE Piping Run# 1 DIE <br /> Piping Material: flexline flexline flexline flexline <br /> Piping Manufacturer: W.f. W.f. W.f. W.f. <br /> Piping Diameter: 211 2" 211 211 <br /> Length of Piping Run: 81 10, 3 0' 10, <br /> Product Stored: DIESEL DIESEL DIESEL DIESEL <br /> Method and location of DIESEL DIESEL DIESEL DIESEL <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 5:54 6:01 4 :28 4 :24 <br /> Initial Reading(RI): 5psi 5psi 5psi 5psi <br /> Test End Time: 5:55 6:02 4 :2 9 4:2 5 <br /> Final Reading(RF ): 0 0 0 0 <br /> Test Duration: lmin lmin lmin lmin <br /> Change in Reading(RF-1?4 ): 5psi 5psi 5psi 5psi <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> with the big flow piping it seems that all three big flows end up in transition sumps <br /> but with out the blue prints i have not idea what goes where so i tested from both <br /> ends. transition sump and diesel stp sump. <br />