My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 2:47:40 PM
Creation date
6/23/2020 6:59:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\15237\PR0517272\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' S'WRCB,January 2002Page 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard "F--'. Professional Engineer <br /> Other (Specify) <br /> Test Method Used: MPressure Vacuum F Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> MEN= Piping Run# 1 DIE Piping Run# 1 DIE Piping Run# 5 PRE Piping Run# <br /> Piping Material: flexline fiberglass flexline <br /> Piping Manufacturer: w.f. ame ron w.f. <br /> Piping Diameter: 211 5 It 2 ' <br /> Length of Piping Run: 301 601 90 , <br /> Product Stored: DIESEL DIESEL PREMIUM <br /> Method and location of DIESEL DIESEL PREMIUM <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min <br /> starting test: <br /> Test Start Time: 3 :50 3 :56 8:S6 <br /> Initial Reading(RI ): 5psi 3psi 5psi <br /> Test End Time: 3 :51 3 :57 9:56 <br /> Final Reading(RF ): 0 0 5psi <br /> Test Duration: lmin imin 1hr <br /> Change in Reading(RF-RI ): 5psi 5psi 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> IM o-M� , <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> with the big flow piping it seems that all three big flows end up in transition sumps <br /> but with out the blue prints i have not idea what goes where so i tested from both <br /> ends. transition sump and diesel stp sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.