Laserfiche WebLink
' S'WRCB,January 2002Page 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard "F--'. Professional Engineer <br /> Other (Specify) <br /> Test Method Used: MPressure Vacuum F Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> MEN= Piping Run# 1 DIE Piping Run# 1 DIE Piping Run# 5 PRE Piping Run# <br /> Piping Material: flexline fiberglass flexline <br /> Piping Manufacturer: w.f. ame ron w.f. <br /> Piping Diameter: 211 5 It 2 ' <br /> Length of Piping Run: 301 601 90 , <br /> Product Stored: DIESEL DIESEL PREMIUM <br /> Method and location of DIESEL DIESEL PREMIUM <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min <br /> starting test: <br /> Test Start Time: 3 :50 3 :56 8:S6 <br /> Initial Reading(RI ): 5psi 3psi 5psi <br /> Test End Time: 3 :51 3 :57 9:56 <br /> Final Reading(RF ): 0 0 5psi <br /> Test Duration: lmin imin 1hr <br /> Change in Reading(RF-RI ): 5psi 5psi 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> IM o-M� , <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> with the big flow piping it seems that all three big flows end up in transition sumps <br /> but with out the blue prints i have not idea what goes where so i tested from both <br /> ends. transition sump and diesel stp sump. <br />