Laserfiche WebLink
SWRCB,January 2002 Page 9 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 1-1 Sump Manufacturer F-1 Industry Standard ❑X Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: ❑ Pressure 1-1 Vacuum Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vP1t Equipment Resolution: vplt to gph <br /> Sump# 5 PRE Sump# 4 DNL Sump# 3 DIE Sump# 2 DIE <br /> Sump Diameter: 4811 4811 48 1' 4 8" <br /> Sump Depth: 67" 67" 67" 67" <br /> Sump Material: fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 1511 1511 2911 29" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 1511 1511 2211 22" <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good good good <br /> Portion of Sump Tested: l 1711 17 It 3111 31" <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothX❑yes❑No❑N [Yes El Yes❑NoE:]N '-'Yes�No�T <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe ❑ ❑ � ❑ <br /> shutdown?* X Yes N N X❑Yes N N X❑Yes N N X Yes No[:]N <br /> Was fail-safe verified to be ❑ ❑ � ❑ � ❑ ❑ ❑ <br /> operational?* X Yes N N 'Yes N N X Yes N N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5min 5min <br /> test: <br /> Test Start Time: 5 :00 4 :58 5:54 6:3 6 <br /> Initial Reading(RI): 8.792 6.353 7.123 4.286 <br /> Test End Time: 5 :30 5:28 6:24 7:06 <br /> Final Reading(RF): 8.792 6.355 7.083 4.286 <br /> Test Duration: 3 Omin 3 Omin 3 Omin 3 Omin <br /> Change in Reading(RF-RI ): .000gph .000gph .003gph .000gph <br /> Pass/Fail Threshold or Criteria: .05gph .05gph .05gph .05gph <br /> Was sensor removed for testing? lflYes[]N�NA[flYesE]No❑NA EYes❑No❑NA EYes�No❑N <br /> Was sensor properly replaced and ❑ � � ❑ � ❑ � C ❑ ❑ '1�V <br /> verified functional after testing? X Ye N NA X Ye N NA X Ye N NA X yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> the sixth and seventh set of data were transition sump one and two consecutively and <br /> transition sump 2 was not tested due to capasity(need more water to test) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is "NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />