Laserfiche WebLink
SWRCB,January 2002 Page 12 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer Industry Standard X❑ Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: FI Pressure F Vacuum 1XI Hydrostatic <br /> El Other (Spec) <br /> Test Equipment Used: vpl t Equipment Resolution: vplt to gph <br /> UDC# 9/10 UDC# 11/12 UDC# 13 UDC# 14/15 <br /> UDC Manufacturer: W•f. W.f. W.f. W.f. <br /> UDC Material: fiberglass fiberglass fiberglass fiberglass <br /> UDC Depth: 3111 3111 3111 3111 <br /> Height from UDC Top to Top of 9" got got got <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 1/211 1/2" 1/211 1/2" <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good good good <br /> Portion of UDC Tested: t 11" 11" 11 <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothX�yes�No❑N Yes MN Yes❑N�N F71Yes�No�IV <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe ❑ 1:1 � ❑ ❑ ❑ <br /> shutdown?* X Yes N N X Yes N N X Yes N N X Yes[]NoaA <br /> Was fail-safe verified to be � ❑ � ❑ � ❑ <br /> operational?* % Yes N N X❑Yes N N X❑Yes N N X❑Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5MIN 5MIN 5MIN 5MIN <br /> test: <br /> Test Start Time: 16:04 16:02 11:15 11:02 <br /> Initial Reading(RI): 4.912 3 .765 9.490 3.286 <br /> Test End Time: 16:19 16:17 11:30 11:17 <br /> Final Reading(RF): 4.912 3 .765 9.490 3.286 <br /> Test Duration: 15min 15min 15min 15min <br /> Change inReading(RF-RI ): .000gph .000gph .000gph .000gph <br /> Pass/Fail Threshold or Criteria: .05gph 05gph .05gph .05gph <br /> Was sensor removed for testing? IflYesoNo❑NA Yes❑No❑NA EYesE]No❑NA EYes❑Noa <br /> Was sensor properly replaced and ❑Ye�N NA X �NNA X❑Ye�N NA X <br /> verified functional after testing? X ❑Ye ❑Yes❑N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to a�of the questions indicated with an <br /> asterisk(*)is "NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />