Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page of_ <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum FK Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon <br />Incon TS -STS Tester <br />Equipment Resolution: +/-0.002" <br />MENEM= <br />Sump # STP 1 87 <br />Sump # STP 2 87 <br />Sump # STP 3 87 <br />Sump # STP 4 87 <br />Sump Diameter: <br />42" <br />Dry <br />42" <br />42" <br />42" <br />Sump Depth: <br />55" <br />❑ Yes ❑ No 9 NA <br />55" <br />55" <br />55" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />114" <br />❑ Yes ❑ No 9 NA <br />16" <br />17" <br />33" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest 8" <br />Electrical Penetration: <br />8" <br />12" <br />8" <br />Condition of sump prior to testing: Dry <br />Dry <br />Portion of Sump Tested' 19" <br />Unable to test <br />Unable to test <br />22" <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes ❑No X NA <br />and water)?* <br />❑ Yes ❑ No 9 NA <br />❑ Yes ❑ No K NA <br />❑ Yes ❑ No 9 NA <br />-product <br />Turbine shutdown response time <br />Is system programmed for fail-safe ❑ Yes []No k] NA <br />❑Yes ❑ No ® NA <br />❑ Yes ❑ No L NA <br />❑ Yes ❑ No ® NA <br />-shutdown?* <br />Was fail-safe verified to be ❑ Yes [-]No k NA <br />❑ Yes ❑ No 9 NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />-operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting 15 minutes <br />test: <br />15 minutes <br />Test Start Time: 1:19pm 1:36pm <br />12:OOpm 12:34pm <br />Initial Reading (RI): 6.8981" 6.8974" <br />4.2571" 4.2633" <br />Test End Time: 1:34pm 1:51 pm <br />12:15pm 12:50pm <br />Final Reading (RF): 6.8975" 6.8973" <br />4.2569"1 4.2638" <br />Test Duration.. 15 Minutes Each (30) <br />15 Minutes Each (30) <br />Change in Reading (RF -RI): -0.0006 -0.0001 <br />-0.0002 0.0005 <br />Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" <br />+/-0.002" 1 +/-0.002" <br />Was sensor removed for testing? k Yes ❑No ❑ NA ❑ Yes ❑ No ®NA ❑ Yes []No ®NA ® Yes ❑ No ❑ NA <br />Was sensor properly replaced and ® Yes []No ❑ NA ❑ Yes ❑ No 9 NA ❑ Yes ❑ No ® NA ® Yes ❑ No ❑ NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />* Unable to test STP 2 due to a 2" missing boot. <br />* Unable to test STP 3 due to a defective electrical boot 3"x1.5" <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />