Laserfiche WebLink
Work Plan for Groundwater Monitoring Well Installation, <br /> Soil Gas and Groundwater Investigation, <br /> and Groundwater Monitoring <br /> Army Aviation Support Facility Stockton California <br /> Project Role Personnel <br /> Corporate Project QC Manager John Fleissner, P.E. <br /> (414) 607-6734 <br /> Corporate Safety & Health Manager William Fink, CIH, CSP, <br /> CHMM <br /> (414) 607-6779 <br /> Project Manager Michael Quillin. P.G. <br /> (925) 906-9698 <br /> Project QC Manager/Correspondence & Submittals Suman Sharma <br /> Coordinator (510) 260-6463 <br /> Field Manager J.D. Lenzen <br /> (510) 301-8135 <br /> Field Quality Control Engineer/Site Safety and Health Officer Lik-See Chung, P.E. <br /> (SSHO) (650) 504-5122 <br /> A brief description of key roles is summarized below. <br /> 6.2.1 Corporate Project QC Manager <br /> Mr. John Fleissner will ensure that appropriate resources, training, and lines of authority are <br /> established, and will interface with the Project QC Manager and Project Manager to ensure <br /> project needs are being met. <br /> 6.2.2 Project QC Manager <br /> Ms. Suman Sharma will provide overall project quality control oversight, provide advice for <br /> project implementation, and coordinate correspondence and submittals on QC issues with the <br /> CA ARNG RPM. The Project QC Manager reports to the Project Manager and is responsible for <br /> certifying that the project has been completed in accordance with the Work Plan. In the event of <br /> a corrective measure being implemented, the Project QC Manager will verify that the corrective <br /> action is approved by the Project Manager and has been implemented by the Field Manager. <br /> 6.2.3 Field Quality Control Engineer <br /> Mr. Lik-See Chung, P.E., is the lead on-site person who will ensure that the project is being <br /> performed in compliance with the Work Plan. No work will be performed in the absence of Mr. <br /> Chung's oversight. <br /> 6.2.4 Field Manager <br /> Mr. J.D. Lenzen will be responsible for overseeing implementation of all field activities at the <br /> site, including safety, quality and production. He will maintain a physical presence at the site at <br /> all times when site work is being performed and has the authority to stop work for safety <br /> violations and remove personnel that fail to comply with the safety program (including <br /> subcontractors). <br /> OTI E 17 <br />