Laserfiche WebLink
HD Supply Policy No: EHS EO-02 <br /> Environmental, Health &Safety <br /> SVPPLY <br /> • Management System <br /> Page: 18 of 43 <br /> (Proprietary& Confidential <br /> Hazardous Waste Mana ement Version: 8—07/30/18 <br /> Prepared By: Approved By: <br /> Enterprise EHS Department Robert F. Peters, Jr. —Sr. Director- Environmental, Health & Safety <br /> 4.13.3 When the Contractors' work has the potential to result in Co-Generation of quantities <br /> of Hazardous Waste more than de minimis amounts, arrangements for the Co- <br /> Generation process shall be included in the agreement between HD Supply and the <br /> Contractor. <br /> 4.14 Central Accumulation Area and Satellite Accumulation Area Inspections <br /> 4.14.1 The DEA(s) shall conduct regular inspections of Central Accumulation Areas and <br /> Satellite Accumulation Areas to ensure there are no leaks or spills; Hazardous Waste <br /> is properly containerized, segregated, and labeled; and the areas are in an orderly <br /> condition. <br /> 4.14.2 Such regular inspections shall take place according to the schedule provided in Table <br /> 1 below. <br /> Table 1 <br /> Generator Central Accumulation Area Satellite Accumulation Area Inspection <br /> Status Document <br /> Daily Weekly Monthly Daily Weekly Monthly <br /> VSQG N/A Visual Documented N/A Visual Documented Monthly <br /> Hazardous <br /> Waste <br /> Checklist <br /> SQG Visual Documented N/A Visual Documented N/A Weekly <br /> Hazardous <br /> Waste <br /> Checklist <br /> LQG Visual Documented N/A Visual Documented N/A Weekly <br /> Hazardous <br /> Waste <br /> Checklist <br /> 4.14.3 Links to the Hazardous Waste area inspection checklists can be found in Appendix <br /> B. <br /> Any printed copy of this document is an uncontrolled document. The current version is available on the HD Supply Corporate EHS Intranet. <br />