My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TENTH
>
150
>
2900 - Site Mitigation Program
>
PR0505598
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:25:12 AM
Creation date
7/1/2020 9:43:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505598
PE
2950
FACILITY_ID
FA0006889
FACILITY_NAME
AMERICAN SAVINGS & LOAN
STREET_NUMBER
150
Direction
W
STREET_NAME
TENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23505402
CURRENT_STATUS
01
SITE_LOCATION
150 W TENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Multiple drive power trains (when available) on rig vehicle shall be mobilized <br /> for off-road travel. <br /> • Travel directly up or down grade on slopes is preferred. <br /> • Changes in grade shall be approached squarely to avoid shifting loads or <br /> unexpected weighting. <br /> • A spotter (person at grade) to provide guidance when vertical and lateral <br /> clearance is questionable shall be utilized. <br /> • Use hand brakes and chock rig wheels when grades are steep. <br /> • Rig mast shall be lowered when traveling off-road. <br /> • All loads to rig shall be secured prior to off-road mobilization. <br /> • Locate and treat overhead electrical lines as if they were energized. <br /> • Utility agencies shall be contacted to de-activate overhead service in areas that <br /> interfere with drilling operations. Utilities shall be handled only by utility <br /> personnel. <br /> • Utility agencies shall be contacted to survey, mark and flag locations of buried <br /> utility lines. <br /> • Allow at least 20 feet clearance between rig mast and overhead utility lines. <br /> Prevent rig contact with utility lines. <br /> • Stabilize and level each work site prior to drill rig setup. <br /> • Maintain orderly housekeeping on and around the drill rig. <br /> • Store tools, materials and supplies to allow safe handling by drill crew <br /> members. Proper storage on racks or sills will prevent spreading, rolling or <br /> sliding. <br /> • Storage of tools, materials or supplies within or on the drill rig derrick during <br /> transportation shall be avoided. <br /> • Store gasoline only in containers specifically designed or approved for such <br /> use. <br /> • Wear eye protection when chipping, chiselling or breaking material that <br /> presents a risk of flying objects. <br /> CRC Environmental Risk Management,Inc. Project No. 2100-217-2 <br /> American Savings Bank 150 West 10th Street <br /> February 15, 1995 13 Tracy,California <br />
The URL can be used to link to this page
Your browser does not support the video tag.