My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7679
>
4500 - Medical Waste Program
>
PR0536173
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2023 11:13:18 AM
Creation date
7/3/2020 10:21:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4500 - Medical Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536173
PE
4530
FACILITY_ID
FA0014430
FACILITY_NAME
Aramark Uniform & Career Apparel, LLC-Stockton
STREET_NUMBER
7679
STREET_NAME
LONGE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
7679 LONGE ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\MW\MW_4530_PR0536173_7679 LONGE_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. 1. Policy <br />It is the policy of Sodexo Laundry Stockton to maintain strict quality standards for the <br />processing of all hospital linen. <br />15.2. Process <br />Various computerized monitoring devices are in place and functional on a 24 hour <br />basis at the plant. <br />15.3. Procedure: Temperature <br />• Verify correct setting of all temperature gauges by referring to appropriate <br />charts located at each unit. <br />• Maintain appropriate temperatures as follows: (refer to attached <br />Recommended Wash Formulas charts.) <br />• • - • -F <br />LEE= <br />• Verify correct pH balance two times per cycle. Verify when water is <br />introduced into the Dissolved Air Flotation (DAF) tank by a fixed electronic <br />meter. <br />• Chart results. <br />15.5. Procedure: Routine and Preventative Maintenance <br />• Lubricate bearings, pumps, and meters every 72 hours. <br />• Check alignment of all belts and pulleys. <br />• Check oil level of all equipment boxes. <br />• Check all valves and couplers for leakage. <br />• Check gauges for accuracy. <br />• Record that all appropriate checks have been done. <br />• In clean linen areas, wash the following equipment with the designated <br />formula one time per day: <br />o Tanks <br />o Rotary screens <br />o Pump screens <br />o Chemical pumps <br />o Flotation system <br />o UV system <br />o Conveyor belts <br />• In soil linen areas, wash all the equipment with the designated formula one <br />time each shift. <br />12.09 -38- <br />
The URL can be used to link to this page
Your browser does not support the video tag.