My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2441
>
4400 - Solid Waste Program
>
PR0526162
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2020 2:37:20 PM
Creation date
7/3/2020 10:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0526162
PE
4430
FACILITY_ID
FA0004701
FACILITY_NAME
TEICHERT PRECAST STOCKTON
STREET_NUMBER
2441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16334009
CURRENT_STATUS
02
SITE_LOCATION
2441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0526162_2441 W CHARTER_FILE 1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(F) Contractor shall pay for all gas, `cater, electricity, and other <br /> public utilities which may be needed for the operation of the garbage and refuse <br /> disposal facility upon the Site. <br /> (G) Contractor shall not accept non-combustible materials or materials <br /> too large for incineration unless mutually agreed to by City and Contractor. <br /> (H) Contractor shall provide unloading facilities with capacity <br /> sufficient to permit the dumping of garbage and refuse by not less than eight (8) <br /> trucks at one time. <br /> (I) Contractor shall operate the garbage and refuse disposal facility <br /> seven (7) days per week as follows: <br /> (1) The City, scavengers, scavenger companies, and other persons <br /> engaged in the business of collecting refuse and garbage shall be permitted to <br /> dispose of garoage and refuse on Monday through Saturday, inclusive, between the <br /> hours of 6:00 o'clock A.M. to and including the hour of 5:00 o'clock P.M. <br /> (2) Members of the public desiring to dispose of garbage and <br /> refuse shall be permitted to dispose of the same daily on Monday through Sunday, <br /> inclusive, between the hours of 8:00 o'clock A.M. to and including the hour of <br /> 5:00 o'clock P.M. <br /> (3) The garbage and refuse disposal facility will be non-operating <br /> and closed for business on all holidays observed by the Stockton Scavenger Asso- <br /> ciation or the duly authorized City Collector. <br /> (J) Contractor shall clean and care for all refuse dumping areas in- <br /> cluding but not limited to incinerator hoppers, floors, and conveyors at frequent <br /> intervals so as to prevent obnoxious odors, unsanitary conditions, or unsightly <br /> appearances on the Site. Contractor shall maintain the entire Site in a clean <br /> and sanitary manner. <br /> (K) Landscaping and screen planting shall be done by the Contractor in <br /> conformity with the landscaping plans of the City Sewage Disposal Area. A sketch <br /> of the landscaping and screen planting shall be submitted to the City for its <br /> r approval. <br /> (L) No obnoxious or unpleasant odors of any type shall be emitted or <br /> permitted by reason of the operation of the garbage and refuse disposal facility. <br /> ®j�® M-Fri 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.