Laserfiche WebLink
Morris Allen <br />March 21, 1990 <br />Page 2 <br />SLUDGE HANDLING AT AUSTIN ROAD LANDFILL <br />6. The LEA and the Integrated Waste Management Board must <br />also be kept informed and their approval will also be <br />required. <br />7. Mr. Jeffrey Tucker told Stephen Chen that, prior to the <br />hauling of the yearly 5,000 cubic yards of sludge, the <br />Water Board will require a laboratory analysis of sludge <br />for their approval. <br />We -were told by the Water Board that the manager of the landfill <br />is responsible to make sure everything will comply to the <br />regulations to their satisfaction. As you know, we have enough <br />underground water contamination problem and other problems to <br />deal with at this landfill. We would like to avoid creating any <br />more potential problems for the future. <br />Please review this information and let us meet to decide how best <br />to handle this problem. <br />JAMES B. GIOTTONINI <br />PUBLIC WORKS DIRECTOR <br />JBG:SC: gh <br />cc: Stephen Chen, Deputy Public Works Director/Streets <br />