Laserfiche WebLink
green waste sloughing and/or washing down the operating face of the landfill. Therefore, <br />Gambi is required to have an attendant on duty (from 6:00 am or sunrise until 4:30 pm) on <br />days when the landfill is closed and the working face has been covered with green waste. <br />The attendant on duty will be a landfill equipment operator who is trained in operating all of <br />the equipment at the Austin Road Landfill. The equipment operator shall be directed (in case <br />of green waste sloughing and/or washing down the operating face of the landfill) to use <br />necessary equipment to place over the working face of the landfill. In the event that the <br />green waste is too wet to place ver the working face of the Landfill, then the attendant shall <br />cover the working face with C vertech 400 Tarps, visqueen, etc. <br />V. DRAINAGE: (. Pe" <br />,P Va <br />The storm water runoff will collect at the south toe of the soil stockpiled for use as cover <br />material. Three 4 inch diameter pipes have been installed under the stockpile of cover material <br />(Figure 2). If water ponds in this area, portable pumps will be placed in the low area and the <br />runoff pumped through the pipes to the drainage ditch located between the dirt stockpile and the <br />access road. <br />The storm water from the remainder of the Landfill will be handled in accordance with the <br />intermediate grading plan which was submitted and approved on September 21, 1990, by the <br />State Water Quality Control Board. <br />Approximately 5,000 cubic yards of soil has been stockpiled at the Landfill for use as soil <br />cover on Friday of each week (Figure 2, page 3). It is estimated that the 5,000 cubic yards of <br />soil will provide six weeks of cover. During the rainy season (November through April) the <br />stockpile of dirt will be covered with visqueen to help keep the soil dry and useable as cover <br />material. <br />If more cover material is needed, it will be replenished during periods of dry weather. <br />VII. SUMMARY: <br />This Winterization Plan is designed to provide continual and uninterrupted service for the <br />winter of 1995-96; with use of green waste as ADC, proper drainage, provision of adequate <br />refuse space, and compliance with applicable rules and regulations. <br />If you have any tions, please call me at 465-8404. <br />e <br />P IL GIAMBASTIANI, PRESIDENT <br />GAMBI ENTERPRISES, INC. <br />PG:hwm <br />cc: James Giottonini, Public Works Director, City of Stockton <br />