My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1996-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 8:55:58 AM
Creation date
7/3/2020 10:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2003
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUR <br /> Forward is currently installing a new landfill gas extraction system at the Austin Road/Forward <br /> Landfill to work in conjunction with the current gas extraction system at the Austin Road Landfill. <br /> According to the current gas extraction facility operator (Mr. Dennis Young), the current Austin <br /> Road gas extraction system has been shut off for periods of up to one month during the last six <br /> months to allow for the relocation of Littlejohn Creek, to allow for resumed landfill operations at <br /> Austin Road, and the ongoing installation activities associated with the new landfill gas extraction <br /> system at the site. <br /> Based on the soil gas monitoring data, Forward proposes continuing with the routine monitoring <br /> activities on a quarterly basis and re-evaluating the locations of the current soil gas monitoring <br /> network once the landfill gas extraction system installation and the Littlejohn Creek relocation <br /> projects have been completed. According to Forward personnel, soil gas monitoring will be <br /> conducted again during the first quarter of 2003. If you have any questions, please call me at (916) <br /> 786-0320. <br /> Sincerely, <br /> les E. Eisert, R.G. (#7000) <br /> Senior Project Hydrogeologist <br /> cc: Ross Atkinson, RWQCB <br /> Butch Stefani, Forward Landfill <br /> Lochlin Caffey, Allied Waste Industries <br /> Project File, LFR <br />
The URL can be used to link to this page
Your browser does not support the video tag.