Laserfiche WebLink
City of Stockton Draft Amended Report of Waste Discharge(AROWD) <br /> Austin Road Landfill Work Plan <br /> A centrally located decontamination station will be established for steam cleaning of drilling <br /> equipment. This decontamination system will include a pad on which the drill rig and other large <br /> drilling equipment,such as auger flights,can be steam cleaned. The drilling rig and other drilling <br /> equipment will be steam cleaned between each hole. The pad will be constructed so that it drains into <br /> a sump. Steam cleaning water collected in the sump will be collected by a vacuum truck contractor <br /> and disposed of at the ARL Groundwater Treatment Facility. <br /> All equipment decontamination episodes will be recorded in the field logbook. The general <br /> decontamination procedures are as follows: <br /> ■ A sufficient supply of tap water will be obtained from the Austin Road Landfill water supply <br /> system. <br /> ■ Augers,well casing,and well screen will be steam cleaned to remove all visible dirt. <br /> ■ Copious amounts of water with a phosphate-free detergent will be used to wash and brush all <br /> dirt from the sampling item,including the steam cleaned items. <br /> ■ Sampling items will be rinsed thoroughly with tap water,checked for any residual dirt,and <br /> rewashed if necessary. <br /> ■ The item will be rinsed with solvent to remove residual organics. <br /> ■ The item will be rinsed twice with tap water. <br /> ■ The item will then be rinsed with deionized water(ASTM Type II). <br /> ■ The item will be completely air dried prior to use. Items will be covered if not used immediately. <br /> Large items will be placed on a clean sheet of plastic. <br /> ■ Items not used immediately will be either wrapped in aluminum foil(small items)or in sheet <br /> plastic (large items)to prevent cross-contamination. <br /> 2.2.3 Sample Documentation <br /> The on-site geologist will maintain a field logbook documenting the following: day,date,time <br /> entered site,temperature,weather conditions,names,and titles of personnel present;names and <br /> titles of any visitors on site;arrival time of driller and other subcontractors,feet drilled,materials <br /> used,reference to boring logs,decontamination iterations;any potential problem areas or incidents <br /> and how those may impact the project;and any telephone calls made and how they may have <br /> affected the decision-making process. <br /> A detailed base map will be used in the field during drilling and sampling operations. <br /> 2.2.4 Sample Custody <br /> Sample custody will include the classification,packaging,transportation,identification,labeling, <br /> and handling of all samples collected in the field. <br /> W:\REPORTS\STOCKTON\AUSTIN\WORKPLAN.DOC Page 10 <br />