SECTION 01330 <br /> SUBMITTAL PROCEDURES <br /> PART 1 GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. Requirements and procedures for preparation and submission of submittals. <br /> B. Requirements for preparation of progress schedules. <br /> 1.2 RELATED WORK SPECIFIED UNDER OTHER SECTIONS <br /> A. Individual Specification sections in these Contract Documents contain additional <br /> and special submittal requirements. Individual sections shall take precedence in <br /> the event of a conflict with this section. <br /> 1.3 GENERAL <br /> A. OWNER reserves the right to modify the procedures and requirements for <br /> submittals, as necessary to accomplish the specific purpose of each submittal. <br /> Direct inquiries to the DESIGN ENGINEER or QA/QC CONSULTANT <br /> regarding the procedure, purpose, or extent of any submittal. <br /> B. Review, acceptance, or approval of substitutions, schedules, shop drawings, lists <br /> of materials, and procedures submitted or requested by the CONTRACTOR shall <br /> not add to the Contract price, and resulting additional costs shall be solely the <br /> obligation of the CONTRACTOR. <br /> C. OWNER is not precluded, by virtue of review, acceptance, or approval, from <br /> obtaining a credit for construction savings resulting from allowed concessions in <br /> the Work or materials. <br /> D. OWNER is not responsible to provide engineering or other services to protect the <br /> CONTRACTOR from additional costs accruing from submittals. <br /> E. Submittals processed by the DESIGN ENGINEER or QA/QC CONSULTANT do <br /> not become Contract Documents and are not Change Orders. The purpose of <br /> submittal review is to establish a reporting procedure and is intended for the <br /> CONTRACTOR's convenience in organizing the Work and to permit the <br /> DESIGN ENGINEER or QA/QC CONSULTANT to monitor the <br /> CONTRACTOR's progress and understanding of the design. <br /> F. Delays caused by the need for resubmittal shall not constitute basis for claim. <br /> G. After checking and verifying all field measurements, make submittals to DESIGN <br /> ENGINEER or QA/QC CONSULTANT, in accordance with the schedule of <br /> submittals for review. <br /> 1. Submittals shall bear a stamp or specific written indication that the <br /> CONTRACTOR has satisfied its responsibilities under the Contract <br /> Documents with respect to the review of the submittal. <br /> 2. Data shown shall be complete with respect to quantities, dimensions, <br /> specified performance and design criteria, materials, and similar data to <br /> enable the DESIGN ENGINEER or QA/QC CONSULTANT to review the <br /> Forward Landfill WMU FU-04 <br /> 01330 1 SUBMITTAL PROCEDURES <br />