My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
information. <br /> H. At the time of each submission, give DESIGN ENGINEER or QA/QC <br /> CONSULTANT specific written notice of each variation that the submittal may <br /> have from the requirements of the Contract Documents. <br /> I. The DESIGN ENGINEER or QA/QC CONSULTANT's review will be only for <br /> conformance with the design concept of the project and for compliance with the <br /> information given in the Contract Documents, not extending to means, methods, <br /> techniques, sequences, or procedures of construction (except where a specific <br /> means, method, technique, sequence, or procedure of construction is indicated in <br /> or required by the Contract Documents) nor to safety precautions or programs <br /> incident thereto. <br /> J. The DESIGN ENGINEER's or QA/QC CONSULTANT's review of submittals <br /> shall not relieve the CONTRACTOR from responsibility for any variation from <br /> the requirements of the Contract Documents unless Contractor has in writing <br /> called the DESIGN ENGINEER or QA/QC CONSULTANT's attention to each <br /> such variation at the time of submission, and has received written approval from <br /> the DESIGN ENGINEER of each such variation by a specific written notation <br /> thereof incorporated in or accompanying the shop drawing or sample approval; <br /> nor will any approval by DESIGN ENGINEER relieve the CONTRACTOR from <br /> responsibility for errors or omissions in the shop drawings or from responsibility <br /> for having complied with the provisions herein. <br /> K. Where a shop drawing or sample is required by the Specifications, related Work <br /> performed prior to the DESIGN ENGINEER's review and approval of the <br /> pertinent submission shall be the sole expense and responsibility of the <br /> CONTRACTOR. <br /> L. Timeliness: Schedule and make submissions in accordance with requirements of <br /> individual Specification sections and in such sequence as to cause no delay in <br /> Work or in Work of other contractors. <br /> M. Incomplete Submittal Submissions: <br /> 1. The DESIGN ENGINEER or QA/QC CONSULTANT will return the entire <br /> Submittal for the CONTRACTOR's revision/correction and resubmission. <br /> 2. Submittals which do not clearly bear CONTRACTOR's specific written <br /> indication of CONTRACTOR review and approval of Submittal or which <br /> are transmitted with an unsigned or uncertified submission form or as may <br /> otherwise be required will be returned to CONTRACTOR unreviewed. <br /> N. ENGINEER's Review: The DESIGN ENGINEER or QA/QC CONSULTANT <br /> will act upon the CONTRACTOR's Submittal and transmit response to the <br /> CONTRACTOR not later than 10 days after receipt, unless otherwise specified. <br /> Resubmittals will be subject to the same review time. <br /> 1.4 SUBMITTAL PROCEDURES <br /> A. Identify each submittal with the numbering and tracking system used in each <br /> Specification Division. <br /> B. Submit three copies to DESIGN ENGINEER or QA/QC CONSULTANT for <br /> review and approval in accordance with the accepted schedule of submittals. <br /> Forward Landfill WMU FU-04 <br /> 01330 2 SUBMITTAL PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.