My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mechanism required at the existing gate for construction use. <br /> b. Where existing fencing is used or modified for security fence, restore <br /> to original condition at completion of the Work. <br /> 3.2 SAFETY AND PROTECTION <br /> A. Safety Requirements: <br /> 1. CONTRACTOR shall do whatever Work is necessary for safety and be <br /> solely and completely responsible for conditions of the jobsite, including <br /> safety of all persons (including employees) and property during the Contract <br /> period. This requirement shall apply continuously and not be limited to <br /> normal working hours. <br /> 2. Safety provisions shall conform to Federal and State Departments of Labor <br /> Occupational Safety and Health Act (OSHA), and other applicable federal, <br /> state, county, and local laws, ordinances, codes, requirements set forth <br /> herein, and regulations that may be specified in other parts of these Contract <br /> Documents. Where these are in conflict, the more stringent requirement <br /> shall be followed. CONTRACTOR shall become thoroughly familiar with <br /> governing safety provisions and shall comply with the obligations set forth <br /> therein. <br /> 3. CONTRACTOR shall develop and maintain for the duration of the <br /> Contract, a safety program that will effectively incorporate and implement <br /> required safety provisions. CONTRACTOR shall appoint a qualified <br /> employee who is authorized to supervise and enforce compliance with the <br /> safety program. <br /> 4. OWNER, DESIGN ENGINEER, or QA/QC CONSULTANT's duty to <br /> conduct construction review of the CONTRACTOR's performance is not <br /> intended to include a review or approval of the adequacy of <br /> CONTRACTOR's safety supervisor, safety program, or safety measures <br /> taken in, on, or near the construction site. <br /> 5. As part of safety program, CONTRACTOR shall maintain at its office or <br /> other well-known place at the jobsite, safety equipment applicable to the <br /> Work as prescribed by the governing safety authorities, and articles <br /> necessary for giving first-aid to the injured. Establish procedures for the <br /> immediate removal to a hospital or a doctor's care of persons who may be <br /> injured on the jobsite. <br /> 6. Comply with OWNER's safety rules while on OWNER's property. <br /> 7. If death or serious injuries or damages are caused, the accident shall be <br /> reported immediately by telephone or messenger to the OWNER. In <br /> addition, CONTRACTOR shall promptly report in writing all accidents <br /> whatsoever arising out of, or in connection with, the performance of the <br /> Work whether on or adjacent to the site, giving full details and statements of <br /> witnesses. <br /> 8. If claim is made by anyone against CONTRACTOR or any subcontractor on <br /> account of accident, CONTRACTOR shall promptly report the facts in <br /> writing, giving full details of the claim. <br /> B. Fire Prevention: Perform all Work in a firesafe manner. <br /> C. Protection of Work and Property: <br /> 1. General: CONTRACTOR shall employ such means and methods necessary <br /> to adequately protect public property and property of the OWNER against <br /> damage. In the event of damage to such property, immediately restore the <br /> property to a condition equal to its original condition and to the satisfaction <br /> Forward Landfill WMU FU-04 TEMPORARY FACILITIES <br /> 01500 3 AND CONTROLS <br />
The URL can be used to link to this page
Your browser does not support the video tag.