My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) Hydrate GCL under 125 psf normal stress for 20 hours with distilled <br /> water. <br /> 4) Anchor lower geotextile component of site-specific GCL to lower <br /> shear box. The upper geotextile component of GCL shall not be <br /> anchored to the box. If the GCL is BENTOMAT DN,the test shall be <br /> assembled so that the dark side shall be in contact with the textured <br /> side of the HDPE geomembrane(i.e., same way as will be deployed in <br /> the field). <br /> 5) Spray upper surface of GCL with water. <br /> 6) Attach the site-specific the geocomposite drainage net and HDPE <br /> geomembrane (per Section 02778) to the upper box. The geotextile <br /> side of the geocomposite drainage net shall be anchored to the upper <br /> box and the geonet side of the geocomposite shall be placed against <br /> the smooth side of the HDPE geomembrane. The textured side of the <br /> HDPE geomembrane shall be facing down and shall be placed over <br /> the GCL in the lower box. <br /> 7) Saturate under test normal stress for 16 hours. Use normal stresses of <br /> 1,000; 2,500; 5,000; and 10,000 psf. <br /> 8) Shear at 0.04 in./min per ASTM D6243. <br /> 9) The testing laboratory should report the interface where deformations <br /> are observed, the initial moisture content of the bentonite component <br /> of the GCL, and the asperity of the geomembrane [GM-12]. The <br /> minimum required interface and internal shear strengths of the <br /> composite liner system shall have a minimum friction angle of 12 <br /> degrees and an apparent cohesion of 0 psf and a friction angle of 5 <br /> degrees and an apparent cohesion of 375 psf for normal load ranges <br /> from 0 to 6,500 psf and from 6,500 to 12,000 psf,respectively. <br /> b. A sample of each tested GCL shall be cut and tested for moisture content <br /> [ASTM D 2216] before and after testing. Moisture contents shall be <br /> recorded and submitted with the test results. The testing laboratory shall <br /> submit a 6-inch square sample of the GCL from the roll used in the testing <br /> to the QA/QC CONSULTANT. <br /> C. The asperity of the geomembrane [GM-12] used in testing shall be <br /> recorded and the data submitted with the test results. The <br /> geomembrane used for testing shall be the same one that will be <br /> shipped to the site for construction of the liner. A 6-inch square <br /> sample of the geomembrane used in testing shall be submitted by the <br /> testing laboratory to the QA/QC CONSULTANT. <br /> Forward Landfill WMU FU-04 5 GEOSYNTHETIC CLAY LINER (GCL) <br /> 02777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.