My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:43:09 AM
Creation date
7/3/2020 10:42:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
closure cost estimate is updated annually for inflation with the annual Financial Assurance <br />submittals to the CIWMB and others. This adjustment provides an estimate in current dollars, <br />such that the closure estimate will be equivalent to closure at the time of closure. This ensures <br />that the cost of activities for closure will not exceed the cost estimate, as long as the method of <br />closure and other closure activities are consistent with the Preliminary Closure Plan <br />(Appendix I). <br />The County will increase or decrease the closure cost estimate when changes to the Plan or <br />changes in conditions at the landfill change the cost of closure, in accordance with Title 27 CCR <br />Section 21820(a)(5) and (6). Revisions to the Closure cost estimate will be submitted as a <br />revision to the Preliminary Closure/Postclosure Maintenance Plan. <br />8.1.2. Construction Quality Assurance <br />Construction quality assurance (CQA) plans are prepared to assure that the facility, or <br />component thereof, is constructed as specified in the approved design. CQA activities include <br />inspections, verifications, audits, and evaluations of materials and workmanship necessary to <br />assess and document the quality of the facility closure. <br />A CQA Plan will be submitted with the Final Closure/Postclosure Plan per Title 27 <br />Sections 20323 and 20324. The CQA Plan will include the following: <br />1. Introductions and Background <br />• Project Description and Participants <br />• Summary of Construction and Inspection Activities <br />• Summary of Significant Design Changes made during construction <br />2. Construction Quality Assurance Results <br />• Field Testing Procedures <br />• Test Pad Testing Results (Field and Lab) <br />• ET Cap Materials and Construction Testing <br />• CQA Observation of Ancillary Facilities Construction (including drainage structures, <br />roads, and fencing). <br />• As -Built Drawing <br />40 <br />Foothill Sanitary Landfill Page 59 of 62 Public Works/Solid Waste <br />JTD County of San Joaquin — Revised 10/6/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.