My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2006_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Sec. 10-1, Construction Details <br /> Std. Spec.Sec 60 <br /> Special <br /> Page 1 of 1 <br /> SECTION 60. BOLLARDS <br /> PART 1 - GENERAL <br /> 1.01 SUMMARY <br /> This section covers the installation of bollards as shown on the construction <br /> drawings, as specified herein. <br /> PART 2 - MATERIALS <br /> 2.01 STEEL PIPE: Steel pipe shall be painted with two (2) coats of YELLOW rust <br /> inhibiting paint. <br /> 2.02 CONCRETE: Concrete used shall comply with the specifications in Section 13-S. <br /> PART 3 - EXECUTION <br /> 3.01 INSTALLATION <br /> A. Install bollards at the specified wells per the well schedule. Locations of bollards <br /> may be adjusted by the Engineer before installation. No additional payment <br /> shall be made due to this adjustment. <br /> B. Install bollards plumb. <br /> C. Remove wet concrete from the outside surface of the bollard after overfilling the <br /> steel pipe with concrete. <br /> PART 4 - MEASUREMENT AND PAYMENT <br /> ' 4.01 MEASUREMENT <br /> ' Measurement for payment for installing bollards shall be per the number of bollards <br /> installed. <br /> ' 4.02 PAYMENT <br /> Payment for Installing bollards shall be per the unit cost quoted in the bid proposal. <br /> ' The unit price quoted shall include full compensation for furnishing all labor, <br /> materials, tools, equipment, and incidentals for painting the bollards with the <br /> specified paint, setting the bollards in concrete plumb, filling the bollards with <br /> ' concrete, and for doing all the work involved completely as shown on the <br /> construction drawings and specified herein. <br /> END OF SECTION <br /> NA2PerimLFGwells 08\Specs\Sect 60-S Bollards.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.