My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:42:29 AM
Creation date
7/3/2020 10:45:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Contractor shall allow the Engineer to install hydrology meter during well <br /> development. <br /> H. Contractor shall develop well using mechanical surging or over pumping or a <br /> combination thereof per ASTM D 5521. Contractor shall purge the well until:. <br /> 1. Well water is clear to the unaided eye. <br /> 2. Sediment in the well casing is less than 0.1 foot thick. <br /> 3. Water removed during surging and purging shall be a minimum of three <br /> times the water volume in the well prior to the start of purging plus three <br /> times the volume of water added for purging and surging. <br /> 4. Contractor shall purge until: <br /> 5. Temperature is consistent within 0.2 deg F, <br /> 6. Specific conductivity is consistent within + 3 percent change in specific <br /> conductance. <br /> 7. pH varies less than 0.2 pH units <br /> 8. Turbidity varies not more than 10% <br /> 3.04 WELL DEVELOPMENT RECORDS <br /> A. Contractor shall submit to the Engineer in the writing the following well <br /> development data for each well development. Submittal shall be made within two <br /> business days of completing well development. Engineer may request any other <br /> data in the field. <br /> 1. Name of project, site, well identification number, date and time of <br /> development and name of person developing the well. <br /> 2. Method used for development, to include size, type and make of <br /> equipment, bailer, and/or pump used during development. <br /> 3. Depth to bottom of well pre and post development <br /> 4. Static water level before and after well development <br /> 5. Time spent developing the well by each method, to include typical pumping <br /> rate, if pump is used in development. <br /> 6. Minimum purge volume <br /> 7. Amount of water purged. Provide physical character of water removed, to <br /> 1 include changes during development in clarity, color, particulates, and <br /> odor. <br /> 8. Volume and source of water added to the well, if any. <br /> On-Call Driller RFB 6820 San Joaquin County <br /> Groundwater Monitoring Well Specifications 10 Public Works Dept <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.