My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 003 <br />Project Number: 11-101-01 Date: Wednesday 05/13/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Tem erature: A2prox. range 55-70 F Other: <br />The contractor worked from 7:00 am to 5:00 pm. <br />Excavation: Up to (1) CAT D6 and (1) CAT D8 dozers with ripper attachments assisted up to (4) CAT 627 scrapers (one <br />scrapes was idle in the afternoon) load material from the excavation along north side of the cell. In the morning, the soil was <br />hauled and stockpiled in the current landfill daily cover borrow area north west of the project area (North West Stockpile) for <br />use in landfill operations. In the afternoon, the soil (fine-grained brown silty sand) was hauled to the South Stockpile <br />(Temporary Foundation Stockpile) for use as foundation layer material. <br />North West Stockpile: 6:30 am to 12 pm. (1) CAT 14H motorgrader was observed spreading and grading the soil in the <br />Stockpile fill area and maintaining haul roads. (1) CAT 621 water pull was used to maintain fill areas, haul roads, and <br />excavation areas. <br />South Stockpile: 12 pm to 5 pm. (1) CAT D8 dozer, and (1) CAT 14H motorgrader prepared the foortprint for the stockpile <br />by removing existing vegetation and topsoil. Fine-grained brown silty sand material was hauled from the excavation to the <br />South Stockpile for use as foundation layer material. (1) CAT 825 compactor was used to break the larger clods to aid the <br />future processing of material. Fines content of the stockpile material was estimated between 30 to 40 percent of the portion <br />finer that 3/8 -inch. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT 621 water pull, (4) 627 scrapers, (1) 14H motorgrader, <br />(1) CAT 825 compactor <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />_ J <br />
The URL can be used to link to this page
Your browser does not support the video tag.