Laserfiche WebLink
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 002 <br />Project Number: 11-101-01 Date: Tuesday OS/12/1S <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: ARprox. range 55-85 F Other: <br />The contractor worked from 7:00 am to 4:30 pm. <br />Pioneering Work: (1) CAT 14H motorgrader continued pioneering the site and maintaining haul roads. <br />Excavation: Up to (1) CAT D6 and (1) CAT D8 dozers with ripper attachments assisted up to (3) CAT 627 scrapers load <br />material from the excavation along north sideslope of the cell. The soil was hauled and stockpiled outside of the project limit <br />at the current operation daily cover excavation area for use in current landfill operations. The CAT D8 dozer was idle after <br />mid-morning. (1) CAT water pull assisted dust control during excavation. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT water pull, (4) 627 scrapers, (1) 14H motorgrader, (1) <br />CAT 825 compactor <br />Problems/Resolutions. <br />Visitors: M. Raub <br />Reviewed By: M. Raub <br />-11�.,i��l�li--,",�,.-�.,.,il".-I MAJ, I <br />