My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 057 <br />Project Number: 14-101-01 Date: Wednesday 07/29/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: Jude A <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Tem erature: A22rox. range 70- 100 F Other: <br />The contractor worked from 5:30 am to 3:30 pm. <br />Excavation: No activity observed. <br />Foundation Layer: Up to (4) laborers used hand tools to rework floor and sump subgrade for geosynthetic materials. The <br />slope was previously smooth drum rolled and the handwork today was to address deficient areas. The sump area and the <br />floor were watered, raked and re- rolled using (1) CAT 54B smooth drum roller. <br />Access Road: No activity. <br />Sump Riser Construction: The sump area was reworked extensively, as materials had dried out from weather and <br />associated construction. The sump construction is suspended until liner details are clarified per an RFI #3 <br />North West Stockpile: No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: No activity was observed. <br />Geosynthetic Liner: Geosynthetics detailing and deployment continued on the floor. QA activities included monitoring of <br />placement, trial welds, seaming and collection of destructive seam samples. A cumulative quantity of approximately <br />568,000 SF of GCL and geomembrane has been deployed. <br />Operations Layer Processing. No activity observed today. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (1) CAT 627 scraper, (1) 14H motorgrader, (1) water truck, (1) Hitachi 300 <br />excavator, (1) CAT CS 54B smooth drum roller (vibratory type), (1) CAT TH160B folk lift, (1) CAT 430D backhoe. (1) CAT <br />320 excavator <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />L' <br />
The URL can be used to link to this page
Your browser does not support the video tag.