My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 0S8 <br />Project Number: 14-101-01 Date: Thursday 07/30/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: Jude A <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Tem erature: Approx. range 70- 100 F Other: <br />The contractor worked from 5:30 am to 4:30 pm. <br />Excavation: No activity observed. <br />LCRS Piping: Up to (3) laborers assisted in the welding of the 6" LCRS piping adjacent to the liner on the floor. (1) CAT 436 <br />backhoe and (1) forklift assisted. <br />Access Road: No activity. <br />Sump Riser Construction: No activity observed today. <br />North West Stockpile: No activity observed today. <br />South Stockpile 2 (Operations): (1) CAT 623 scraper was delivered last night and used this morning to pick up soil for the <br />Operations Test Pad. (1) CAT D6 dozer moved soil around in the operations stockpile and pioneered access. <br />South Stockpile 3: (1) CAT D6 dozer moved soil around in the stockpile for access. <br />Geosynthetic Liner: Geosynthetics deployment began on the East slope, covering approximately 2/3 of the slope by the end <br />of the day. QA activities included monitoring of placement, trial welds, seaming and collection of destructive seam <br />samples. A cumulative quantity of approximately 619,000 SF of GCL and geomembrane has been deployed. <br />Operations Layer Processing. (1) CAT 623 paddlewheel scraper began picking up soil from the Operations Layer stockpile <br />and placing the material in thin lifts on the ground in the equipment yard. (1) CAT 54B smooth drum roller was used to make <br />several passes on the material with the vibratory mode on. Several lifts were placed in an approximate area 75 ft long by 50 ft <br />wide to an approximate depth of 1 ft. It was a general consensus that the roller was pushing some of the clods and oversize <br />into the ground, rather than breaking the material up. The contractor made a visual assessment and decided the process <br />would take too long with an uncertain outcome. <br />Other: (1) CAT 320 excavator has been demobed <br />Equipment Onsite: (1) CAT D6T LGP dozer, (1) CAT 627 scraper, (1) 14H motorgrader, (1) water truck, (1) Hitachi 300 <br />excavator, (1) CAT CS 54B smooth drum roller (vibratory type), (1) CAT TH160B folk lift, (1) CAT 430D backhoe. (1) CAT 623 <br />paddlewheel scraper. <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />Aidvrz <br />Earth Sdemaa� Inc- <br />
The URL can be used to link to this page
Your browser does not support the video tag.