My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 061 <br />Project Number: 14-101-01 Date: Tuesday 08/04/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: R. Nogales <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: A22rox. range 70- 85 F Other: <br />The contractor worked from 5:30 am to 4:30 pm. Great Basin worked until 6 pm <br />Excavation: No activity observed. <br />Access Road: No activity observed. <br />Geosynthetic Liner: Geosynthetics detailing and deployment continued in the sump area to complete the upper (primary) <br />liner over the sump and secondary LCRS riser pipe trench up the eastern slope. QA activities included monitoring of <br />placement, trial welds, seaming and collection of destructive seam samples. Vacuum testing continued as the <br />contractor worked to complete QC testing of extrusion seams at patches across the floor and East slope. <br />Construction of the boots around the protruding Secondary LCRS Riser and Lysimeter Riser pipes was started but <br />not completed. Puddle Leak Location operations began today on the western portion of the floor and continued <br />until approximately 2 pm. Leak location testing will continue tomorrow. <br />Operations Layer Processing: Approximately 10 am to 4:30 pm. Screening operations began today at approximately 10 am <br />today. The Hundai 480LC was used to load soil from the east end of Stockpile 2 into the screen plant. Screened product was <br />stockpiled in a cone using a belt stacker to keep the screened soil separate from unprocessed soil. There was no recorded <br />tonnage of material screened today as the scale on the plant was not set up yet. An estimated tonnage is about 1,000 CY <br />screened. (1) Hitachi 300 excavator was used part time for stockpile management. (1) CAT D6 dozer assisted part time by <br />track walking and pushing the oversize reject pile back to the main stockpile for additional screening. A sample of the <br />screened Operations Layer was collected for sieve analysis. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (1) CAT 627 scraper, (1) 14H motorgrader, (1) water truck, (1) Hitachi 300 <br />excavator, (1) CAT CS 54B smooth drum roller (vibratory type), (1) CAT TH160B folk lift, (1) CAT 430D backhoe. (1) CAT 623 <br />paddlewheel scraper. (1) Power Screen, (1) belt stacker, (1) Hundai 480LC excavator. <br />Problems/Resolutions. <br />Visitors: M. Raub <br />Reviewed By: M. Raub <br />a� Fault 5ctdrtceemm Inc <br />wr <br />
The URL can be used to link to this page
Your browser does not support the video tag.