My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />11 <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 064 <br />Project Number: 14-101-01 Date: Friday 08/07/1S <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: R. Nogales <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear - Warm Wind: 0-10 mph. <br />Temperature: Approx. range 66- 93 F Other: <br />The contractor worked from 5:30 am to 5:00 pm. <br />Excavation: No activity observed. <br />Access Road: No activity observed. <br />Operations Layer Processing: Screening began at 5:30 am and the crew worked until 4:30. (1) Hundai 48OLC, (1) Hitachi <br />300 excavator and (1) CAT D6 dozer continued screening operations. The Hundai 480LC was used to load soil from the east <br />end of Stockpile 2 into the Power Screen screening plant. Hitachi 300 Excavator used to stage screened operations material <br />for future haul. D6 Dozer used to support Hundai Excavator and pioneer haul road from stockpile to cell floor. Screened <br />product was stockpiled in a cone using a belt stacker to keep the screened soil separate from unprocessed soil. The oversize <br />material was recycled back into the stockpile after brief track walking with the D6 dozer. The Contractor reported 2,297 tons <br />of material screened today. (2) Samples collected from screened Operations stockpile today. Field Laboratory tests on today's <br />2 samples and yesterdays 1 sample indicates 100% passing the 1" screen. (1) Cat 745 Dump Truck Delivered onsite today. <br />LCRS Gravel Placement: 17 tandem end -dump trucks continued delivery of LCRS gravel today. The material was spread and <br />finished along southwestern portion of cell floor using a Cat D6 LGP dozer equipped with GPS. LCRS Gravel is at finish grades <br />along most of the southern edge of liner to edge of the southernmost proposed Leachate Collection pipe. A small area in the <br />southwestern corner of LCRS gravel remains to be finished. LCRS Gravel spreading discontinued at 2:00 due to moderate to <br />heavy wrinkles observed in HDPE liner. During LCRS gravel placement (1) Laborer was used to control the wrinkles. AES QA <br />personnel monitored the placement and verified the depths of the placed LCRS gravel by using a dulled probe. <br />(1) Field sample of LCRS gravel retrieved from cell floor and gradation performed on site. Field gradation indicated 100% <br />passing 3/8", 41% passing #4 and 1.2% passing #200 screen. <br />Geotextile: RJ Gordon deployed 8 oz/sy geotextile over finished LCRS Gravel along Southwestern most portion floor, starting <br />at edge of Sump working west. (2) Laborers were used to hand roll Geotextile into place. (9) Rolls of 8 Oz Geotextile deployed <br />today. Observed seams sewn using hand sewing machine. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (1) CAT 627 scraper, (1) 14H motorgrader, (2) water trucks, (1) Hitachi 300 <br />excavator, (1) CAT TH160B folk lift, (1) CAT 430D backhoe. (1) CAT 623 paddlewheel scraper. (1) Power Screen, (1) Belt <br />Stacker, (1) Hundai 480LC excavator, (1) CAT D6T dozer. (1) Cat 745 Dump Truck <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />
The URL can be used to link to this page
Your browser does not support the video tag.