My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 065 <br />Project Number: 14-101-01 Date: Monday 08/10/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: R. Nogales <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear - Warm Wind: 0-10 mph. <br />Tem erature: ARprox. range 55- 90 F Other: <br />The contractor worked from 5:30 am to 4:30 pm. <br />Excavation: No activity observed. <br />Access Road: No activity observed. <br />Operations Layer Processing: Screening of Operations Stockpile was performed on Saturday 8/8/2015. AES not on site <br />during screening. (6) Locations within Saturday's screened stockpile were field tested using 1" gradation sieve to measure <br />maximum aggregate size. Observed 100% of material passing 1" Sieve at all (6) locations. (1) Sample collected from Saturday <br />stockpile to run full gradation in field lab. Lab results indicated 100 % Passing 1" Screen. <br />Contractor continued screening of operations stockpile today at 5:30 am. (1) Hyundai 480LC, (1) Hitachi 300 excavator and <br />(1) CAT D6 dozer used to perform screening operations. The Hyundai 480LC was used to load soil from the east end of <br />Stockpile 2 into the Power Screen screening plant. Hitachi 300 Excavator used to stage screened operations material for <br />future haul and remove waste material from under screen plant and belt into separate stockpile. D6 Dozer used to support <br />Hyundai Excavator and finish a haul road from the stockpile to cell floor. Screened product was stockpiled in a cone using a <br />belt stacker to keep the screened soil separate from unprocessed soil. (1) Cat 745 Dump Truck occasionally hauled loads of <br />+1" oversized reject material to top of Stockpile #2. Oversized material was incorporated back into screening operation as D6 <br />Dozer feeds material to Hyundai 480 Excavator. <br />At approximately 9:00 Hyundai 300 began loading (1) Cat 745 Dump Truck with Screened Operations Layer for placement <br />on cell floor. At 11:30 a second Cat 745 Dump Truck was added to operation. (1) D6 LGP Dozer was used to spread <br />Operations layer 2ft thick over deployed 8 oz geotextile along southern edge of cell. At approximately 11:30, a sample of the <br />operations layer was collected in place and a full gradation was run in the field lab. Lab Results indicate 100% passing 1" <br />sieve. <br />Gravel Drainage Material Placement: Early AM - (1) Cat D6 LGP dozer equipped with GPS spread stockpiled GDM along <br />southwest corner of cell floor. (1) Laborer used to control wrinkles and hand grade along edges of cell. Observed wrinkles to <br />be minimal due to early morning weather conditions. AES QA personnel verified the depths of the rock by using a dulled <br />probe. <br />Geotextile: RJ Gordon continued to deploy 8 oz/sy geotextile over finished GDM along south portion of cell working west. (4) <br />Laborers used to hand roll Geotextile into place. (3) Rolls of 8 oz/sy Geotextile deployed today. Observed seams sewn using <br />hand sewing machine. <br />Leachate Collection Pipe: Approximately 300 If of 6" perforated HDPE pipe was placed today along southernmost reach of <br />Leachate Collection Pipe, beginning at sump and heading west. (1) Cat 950 M Loader opertating over completed operations <br />layer soil used to place coarse gravel over 6" Perforated HDPE Pipe. Coarse gravel and 6" HDPE pipe wrapped in 8 oz/sy <br />Geotextile. Depth of Gravel was measured to be a minimum of 1ft in depth and a minimum of 4ft in width. Geotextile was <br />measured to have a 2ft minimum overlap. Sample of coarse gravel was collected from stockpile and field gradation was <br />performed. Results of gradation indicated material generally complied with the approved gradation. 282 tons of coarse <br />gravel delivered today. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (2) water trucks, (1) Hitachi 300 excavator, (1) CAT TH160B folk lift, (1) CAT <br />430D backhoe. (1) CAT 623 paddlewheel scraper. (1) Power Screen, (1) Belt Stacker, (1) Hyundai 480LC excavator, (1) CAT <br />D6T dozer, (2) Cat 745 Dump Truck, (1) Cat 950 M Loader <br />Problems/Resolutions. <br />Visitors: Mike Raub <br />Reviewed By: M. Raub <br />�J <br />