My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />I -- <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 066 <br />Project Number: 14-101-01 Date: Tuesday 08/11/1S <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: R. Nogales <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear - Warm Wind: 0-10 mph. <br />Temperature: A2prox. range 55- 88 F Other: <br />The contractor worked from 5:30 am to 4:30 pm. <br />Excavation: No activity observed. <br />Access Road: No activity observed. <br />Operations Layer Processing: Contractor continued screening of operations stockpile today at 5:30 am. (1) Hyundai 480LC, <br />(1) Hitachi 300 excavator and (1) CAT D6 dozer used to perform screening operations. The Hyundai 480LC was used to load <br />soil from the east end of Stockpile 2 into the Power Screen screening plant. Hitachi 300 Excavator used to stage screened <br />operations material for future haul and remove waste material from under screen plant and belt into separate stockpile. D6 <br />Dozer used to support Hyundai Excavator. Screened product was stockpiled in a cone using a belt stacker to keep the <br />screened soil separate from unprocessed soil. At approximately 7:30 am, a sample of the operations layer was collected from <br />screened stockpile and a full gradation was run in the field lab. Lab Results indicate 100% passing 1" sieve. <br />Gravel Drainage Material Placement: 17 tandem end -dumps used to import Gravel Drainage Material (GDM) from Cemex <br />Rock Plant until 4:30 pm. Observed 3ft of GDM between end dumps and underlying geosynthetics. Contractor has placed <br />temporary plywood sheets over previously installed Leachate collection pipe along Southeastern portion of cell. Temporary <br />plywood to be removed upon completion of GDM placement. (1) Cat D6 LGP dozer equipped with GPS spreading GDM along <br />southeastern portion of cell floor. (1) Laborer used to control wrinkles. GDM spreading discontinued at approximately 1:30 <br />due to moderate to heavy wrinkles observed in HDPE Liner. GDM import continued, with material being stockpiled on <br />previously deployed GDM. AES QA personnel monitored the placement and verified the depths of the placed LCRS gravel by <br />using a dulled probe. <br />At approximately 8:00 am, a sample of the GDM was collected from end dump stockpile and a full gradation was run in the <br />field lab. Results of gradation indicated material generally complied with the approved gradation. Tonnage not available at <br />time of field daily preparation. <br />Geotextile: RJ Gordon deployed and sewed 8 oz/sy geotextile along Southwestern most portion of the cell. GDM not finished <br />in this area due to excessive wrinkles in liner. 8 oz/sy geotextile rolled back awaiting GDM to be graded and finished. (3) <br />Laborers used to hand roll Geotextile into place. Observed seams sewn using hand sewing machine. <br />Leachate Collection Pipe: Contractor continued placement of Leachate Collection Pipe along southern line heading West. <br />Approximately 150 if of 6" perforated HDPE pipe was placed today. (1) Cat 950 M Loader operating over completed <br />operations layer soil used to place coarse gravel over 6" Perforated HDPE Pipe. Coarse gravel and 6" HDPE pipe wrapped in 8 <br />oz/sy Geotextile. Depth of Gravel was measured to be a minimum of 1ft in depth and a minimum of Oft in width. Geotextile <br />was measured to have a 2ft minimum overlap. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (2) water trucks, (1) Hitachi 300 excavator, (1) CAT TH160B folk lift, (1) CAT <br />430D backhoe. (1) CAT 623 paddlewheel scraper. (1) Power Screen, (1) Belt Stacker, (1) Hyundai 48OLC excavator, (1) CAT <br />D6T dozer, (2) Cat 745 Dump Truck, (1) Cat 950 M Loader <br />Problems/Resolutions. <br />Visitors: Mike Raub <br />Reviewed By: M. Raub <br />AdVw0rXW <br />l!^�r�th ;Scic�ta�r„ !nom <br />
The URL can be used to link to this page
Your browser does not support the video tag.