My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 091 <br />Project Number: 14-101-01 Date: Wednesday 09/16/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear - Wind: 0-10m h. <br />Tem erature: Approx. range 65- 80 F Other: <br />The contractor worked from 6:30 am to 5:30 pm. <br />Operations Layer Processing: There was no screening operations today. The contractor has begun to demob the screen <br />plant. <br />Sacrificial Geomembrane: Placement of sacrificial Geomembrane continued on the North slope today. Orientation of the <br />membrane seams complied with the specifications. <br />Operations Layer Placement: Operations layer placement is substantially complete. Finish grading of the layer continued <br />using (1) CAT D6 dozer and (1) CAT 14M motorgrader. (1) JD 410 backhoe and up to 5 laborers dug holes in the Operations <br />Layer for point over point survey in the GDM, scheduled for tomorrow. One foot of material was excavated by the backhoe at <br />designated locations, then laborers excavated the lower portion by hand. <br />Force Main: No activity today. <br />Leak Detection: Leak detection services finished the leak detection survey today. No problems were reported. <br />Anchor Trench: No activity today. <br />Termination Berm Construction: Construction on the western and southern termination berm began today. (2) CAT 745 <br />articulating end dumps hauled materials from Basin 1 and 2. (1) Hundai 480 excavator loaded the trucks inside the basins. Up <br />to (2) CAT D6 dozers mixed fill and spread the materials in 8" lifts prior to compaction using (1) CAT CP 54 self propelled <br />compactor. Water was an issue and the fill was remediated in the late afternoon. There was insufficient fill to test today. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (2) water trucks, (1) Hitachi 300 excavator, (1) CAT TH160B folk lift, (1) JD <br />410K Backhoe. (1) CAT 623 paddlewheel scraper. (1) Power Screen, (1) Belt Stacker, (1) Hyundai 48OLC excavator, (1) CAT <br />D6T dozer, (2) Cat 745 Dump Truck, (1) Cat 950 M Loader (1) CAT D4 Dozer (1) 14M Motor Grader <br />Problems/Resolutions <br />Visitors: <br />Reviewed By: M. Raub <br />Forth scar aa�, /nc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.