My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 101 <br />Project Number: 14-101-01 Date: Wednesday 09/30/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: <br />Contractor: R I Gordon Construction, Inc. M. Hu and <br />Weather: Partly overcast/ Light rain pm Wind: 0-10m h. <br />Tem erature: Approx. range 60- 75 F Other: <br />The contractor worked from lam to 5:30 pm. <br />Electrical Panel Placement: Electricians continued with conduit and wiring on the Sump Pump Control panel. <br />Drainage Structures: (1) CAT D6 dozer, (1) CAT D4 dozer and (1) CAT CP45 compactor backfilled the pipe above the access <br />ramp culvert with earthfill material. The compaction test failed on 2 occasions before achieving 95% compaction. <br />Access Road: (1) CAT 14H motorgrader graded the road. Two density tests of the earthfill were performed and the results <br />indicated the earthfill met the specified 95% relative compaction. <br />LCRS System: The pump was wired and placed in the primary riser. Forced Main panel and pipe was hydrostatically <br />pressure tested for 1 hr at 125 PSI with no drop in pressure. <br />RIP RAP (1) Hundai excavator and (1) CAT 745 truck began preparation of subgrade for rip rap areas at the culvert crossing <br />and in Basin 2 area. <br />Earth Berm: The berm on the east slope was built and tamped in place using (1) Hitachi excavator and (1) CAT 745 truck. <br />Sacrificial Membrane: A sand bag anchor line was installed at the NW limits of Sacrificial Membrane by Great Basin <br />Punch List: The contractor has begun on the punch list items. Some of the activities on the list are ongoing. Major items <br />completed today include: <br />a 1 Laborer walked the area above the operations layer on the tie in and on the leading edge of the operations layer on <br />the north slope and removed any oversize material. <br />o The Forced Main was pressure tested. <br />a The Pump was installed in the LCRS Riser. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (2) water trucks, (1) Hitachi 300 excavator, (1) JD 410 Backhoe. (1) CAT 623 <br />paddlewheel scraper. (1) Hyundai 480LC excavator, (1) CAT D6T dozer, (2) Cat 745 Dump Truck, (1) Cat 950 M Loader, (1) <br />CAT D4 Dozer, (1) CAT 14MH Motor Grader, (1) CAT CP54 compactor. (1) CAT 613 scraper <br />Problems/Resolutions: <br />Visitors: <br />Reviewed By: M. Raub <br />
The URL can be used to link to this page
Your browser does not support the video tag.