Laserfiche WebLink
C <br />GeoSyntec Consultants <br />7. DOCUMENTATION <br />7.1 Daily Recordkeeping and Reporting <br />A daily inspection diary will be kept by the CQA Team with a record of any <br />problems that occur or corrective measures implemented throughout the day. All <br />reports will bear identifying sheet numbers for cross-referencing and document control. <br />7.2 Daily Inspection Sheets <br />All field observations and field testing will be recorded on Daily Inspection Sheets <br />by the CQA Team. All field testing will follow ASTM standardized test procedures and <br />methods of data recording or other test method described in the Project Specifications. <br />Observations in the field may be in the form of notes, charts, drawings or sketches, <br />photographs, or any combination of the above. The Daily Inspection Sheets will <br />contain the following information where applicable: <br />0 • Date, name of project, and location. <br />• Weather and site conditions. <br />• Summary of any meetings conducted (other than formal periodic meetings), <br />names of participants, and the results of the meetings. <br />• Location of daily construction activities and progress. <br />• Record of equipment and personnel working in a particular area. <br />• Location of work being tested and areas passing final inspection. <br />• Description and the condition of any materials received at the site. <br />• Record of equipment calibrations or recalibrations of test equipment and any <br />actions taken as a result of recalibrations. <br />• Site visits by others. <br />J:MLLMDWORWARDXCLOSURE\REPORrCQAREPORT 7-1 99.11.30 <br />0 <br />