Laserfiche WebLink
GeoSyntec Consultants <br />6.3 Action on Failing Tests <br />The results of all tests, whether laboratory or field, passing or failing, must be <br />reported in the Daily Inspection Diary Sheets. Test results not meeting the requirements <br />of the Project Specifications or the CQA Plan shall be resolved in the following manner: <br />• The Contractor's superintendent and the CQA Officer will be immediately <br />advised of all failing test results. <br />• The area or volume of material represented by the failing test will be assessed <br />so that appropriate corrective measures may be evaluated. If a design revision <br />is required, the design engineer will be contacted. Additional tests will be used <br />to define the affected area, as necessary. <br />• The CQA Officer will determine the appropriate corrective action and inform <br />the Contractor regarding said action. If the Contractor cannot correct the <br />problem, the CQA Officer will recommend alternative solutions to the owner <br />for approval. <br />• The required corrective action, results of verification testing, and other <br />documentation regarding the corrective action will be recorded by the CQA <br />Team. <br />J:\ALLIED\FORWARD\CLOSURE\REPORTCQA REPORT 6-9 99.11.30 <br />