My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br />• Each party's responsibilities will be reviewed and discussed, with <br />communication lines identified. <br />• Key personnel will be identified. <br />• The project schedule will be reviewed. <br />• Protocol for field observations and field tests will be explained. <br />• Protocol for handling construction deficiencies, repair work, and re -testing will <br />be discussed. <br />• Protocol for document reporting, handling, distribution, and storage during <br />construction will be discussed. <br />• Procedures to protect construction materials from adverse effects of weather <br />during construction and storage will be discussed. <br />• Work area and safety protocols will be presented by the Contractor. <br />• A site inspection will be conducted to discuss work areas, work plans, <br />stockpiling, and lay -down areas, and other site or construction issues. <br />4.2 Progress Meetings <br />Progress meetings will be held at least weekly to review activities or progress, <br />discuss present and future work, and discuss any current or potential construction <br />problems. The meeting will be attended, at a minimum, by the CQA Team and <br />Contractor. The CQA Team will prepare meeting minutes and record the action items <br />of these meetings in their daily construction inspection diary. <br />4.3 Problem or Work Deficiency Meetings <br />When a problem or deficiency occurs or is likely to occur, special meetings will be <br />held to deal with the problem instead of waiting for the progress meeting. These <br />meetings will be attended by the CQA Team and the Contractor and, if necessary, the <br />J:WLLIED\FORWARD\CLOSURE\REPORT\CQA REPORT 4-2 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.