Laserfiche WebLink
C <br />GeoSyntec Consultants <br />design engineer and Owner. The purpose of these meetings is to identify a problem or <br />deficiency in the construction work, review alternative solutions, and select and <br />implement a plan to resolve the problem or deficiency. The CQA Team will record and <br />distribute minutes of the meeting to all parties. <br />0 J fat _t D\FORWARD\CLOSURE\REPORTICQA REPORT 4-3 99.11.30 <br />