My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br />5. INSPECTION ACTIVITIES <br />Inspection activities will be performed by the CQA Team throughout the project to <br />ensure that construction is proceeding in conformance with the Project Plans and <br />Specifications. These activities are divided into pre -construction, construction, and <br />post -construction activities. <br />5.1 Pre -Construction <br />The CQA Officer will conduct pre -construction training and information sessions <br />with CQA personnel to familiarize them with the specified design, inspection policies, <br />and procedures. Pre -construction inspection activities of the CQA Team will include: <br />• Reviewing and becoming familiar with all design criteria, Project Plans, <br />Specifications, and CQA Plan for the proposed construction. <br />• Look for inconsistencies in the Project Plans, Specifications, and CQA Plan. <br />Any inconsistencies will be discussed with and resolved by the design engineer <br />or Owner. <br />• Perform imported clay material acceptance testing (if needed for clay <br />admixture) at the frequency shown in Table 1. <br />• Forward will measure the thickness of the foundation layer prior to <br />construction. The CQA Team will review the thickness measurements to <br />confirm that the minimum 2 -foot thickness is met. <br />• Forward will place and compact the foundation layer prior to construction. The <br />CQA Team will test the relative compaction of the foundation layer at the <br />frequency shown in Table 2. Forward will expose the relative compaction <br />testing locations under the direction of the CQA Team. <br />• Reviewing existing reports that pertain to construction. <br />• Reviewing Contractor's certifications, submittals, test results, sources, and <br />samples of earth and synthetic materials for acceptance requirements described <br />in the specifications and this CQA Plan. <br />J:kALLIEDU^ORWARD\CL.OSURE\REPORT\CQAREPORT 5-1 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.